My WebLink
|
Help
|
About
|
Sign Out
Home
8U Consent Calendar 2018 0716
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0305
>
Packet 2018 0716
>
8U Consent Calendar 2018 0716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2018 12:34:03 PM
Creation date
7/11/2018 12:34:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/16/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Title: <br />Work Order Number:049724.01 <br />San Leandro Library Boiler Additional Scope Supplemental <br />02 - Site Work <br />02 41 13 13 0038 >6" To 8" By Hand, Break-up And Remove Concrete Paving15 $384.30SF <br />Installation =x x 384.30FactorUnit PriceQuantity Total <br /> 6.44 1.2432 48.00 <br />Breaking of existing concrete to prepare for new housekeeping pad pour. <br />02 41 19 13 0019 Saw Cut Minimum ChargeFor projects where the total saw cutting charge is <br />less than the minimum charge, use this task exclusively. This task should not <br />be used in conjunction with any other tasks in this section. <br />16 $853.20EA <br />Installation =x x 853.20FactorUnit PriceQuantity Total <br /> 686.29 1.2432 1.00 <br />Saw cutting to facilitate demo <br />02 41 19 13 0201 3/4" Diameter Drilling In Brick/Concrete Block Per Inch Of Depth17 $584.80IN <br />Installation =x x 584.80FactorUnit PriceQuantity Total <br /> 1.96 1.2432 240.00 <br />Drilling of dowel rods to 6" embeddment <br />02 85 00 00 0004 Up To 25 LF, Up To 6" Diameter Pipe Insulation, Mold Abatement And Disposal18 $1,395.87LF <br />Installation =x x 1,395.86 <br />FactorUnit PriceQuantity Total <br /> 28.07 1.2432 40.00 <br />Removal and disposal of existing pipe insulation / insulators <br />02 90 50 00 0327 Lubricant, Preserver (Heavy)19 $28.02GAL <br />Installation =x x 28.02 <br />FactorUnit PriceQuantity Total <br /> 22.54 1.2432 1.00 <br />Grooved fitting gasket lubricant <br />$5,230.64Subtotal for 02 - Site Work <br />03 - Concrete <br />03 21 11 00 0004 Grade 50 Reinforcing Steel, Footings And Slabs, #3-#620 $2,894.21TON <br />Installation =x x 2,894.21FactorUnit PriceQuantity Total <br /> 2,328.03 1.2432 1.00 <br />Rebar reinforcement of new pump housekeeping pad <br />03 21 11 00 0040 Dowels Or Hairpin, 1/2" x 36" L, Drilled And Epoxy In Concrete, >6" To 12" <br />Embedment <br />21 $820.51EA <br />Installation =x x 820.51 <br />FactorUnit PriceQuantity Total <br /> 16.50 1.2432 40.00 <br />Housekeeping pad dowel rods to existing foundation <br />03 31 13 00 0022 Hand Mix And Place ConcreteFor use where conventional equipment access <br />is limited or when directed by the owner. <br />22 $1,499.60CF <br />Installation =x x 1,499.60 <br />FactorUnit PriceQuantity Total <br /> 25.13 1.2432 48.00 <br />Concrete mixed and poured in place for new housekeeping pad. <br />$5,214.32Subtotal for 03 - Concrete <br />05 - Metals <br />05 05 23 00 0703 1/2" Diameter x 1-5/8" Long, Welded Stud Concrete Anchors23 $39.38EA <br />Installation =x x 39.38FactorUnit PriceQuantity Total <br /> 2.64 1.2432 12.00 <br />Concrete anchors for pump mounting <br />Page 3 of 7 <br />7/2/2018 <br />Contractor's Price Proposal - Detail
The URL can be used to link to this page
Your browser does not support the video tag.