My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent Calendar 2018 0716
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0716
>
8D Consent Calendar 2018 0716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2018 12:38:50 PM
Creation date
7/11/2018 12:38:49 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/16/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 18-218 <br />Prior to construction, staff will notify the residents of the streets within the project areas of the <br />project and its schedule. The contractor will also provide notification in the form of door hangers <br />immediately before the work. <br />Fiscal Impacts <br />The total project cost is estimated at $2,369,463 as follows: <br />Design and Bid: $81,000 <br />Construction Contract:$1,894,316 <br />Construction Management and Inspection: $110,000 <br />Construction Contingency:$284,147 <br />Total: $2,369,463 <br />Budget Authority <br />The work will be funded by the following appropriations: <br />Account No.Source Fiscal Yr.Amount <br />144-38-393 Measure B Streets FY17-18 $1,850,000 <br />140-31-056 Gas Tax FY17-18 $180,000 <br />210-62-122 General Fund FY17-18 $124,000 <br />(City Park Maintenance) <br />210-18-139 General Fund FY17-18 $2,000 <br />(City Building Maintenance) <br />150-38-404 Cal Recycle Grant FY17-18 $85,000 <br />143-38-381 Vehicle Registration Fees FY 16-17 $156,000 <br />Total Project Appropriation:$2,397,000 <br />ATTACHMENTS <br />·Project Area Map and List of Street Segments to receive treatment <br />·Bid Summary - Annual Street Sealing 2017-18 <br />PREPARED BY: John O’Driscoll, Associate Engineer, Engineering and Transportation <br />Department <br />Page 4 City of San Leandro Printed on 7/10/2018
The URL can be used to link to this page
Your browser does not support the video tag.