My WebLink
|
Help
|
About
|
Sign Out
Home
8A Consent Calendar 2018 0723
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0723
>
8A Consent Calendar 2018 0723
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2018 4:21:55 PM
Creation date
7/17/2018 4:21:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/23/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 18-096 <br />Environmental Review <br />The environmental impact of this project will be evaluated during the design phase. If impacts are <br />found which require mitigation, those mitigations will be included in the construction phase of the <br />project. <br />Summary of Public Outreach Efforts <br />This contract will include several public meetings early in the design phase to gather comments, <br />ideas and input from the neighborhood and community. <br />Fiscal Impacts <br />This contract is not to exceed $325,272 with authorization to issue individual contract <br />amendments to the consultant up to 10% or $32,527 each and cumulative contract amendments <br />up to 25%, or $81,318 of the original contract amount. If the maximum contract amendment <br />amount is used the contract value could potentially be $406,590. The estimated cost of the <br />design portion of this project including associated staff and permit cost is approximately <br />$450,000. As this amount is above the originally budgeted amount of $300,000, staff is <br />recommending appropriating an additional $150,000 of General Fund monies that will be <br />reimbursed upon issuance of the proposed lease revenue bonds in FY 18-19 for project <br />completion. <br />The total cost of the project including construction is estimated at $3,800,000. Funding for the <br />project will consist of existing and future appropriations listed below. <br />Budget Authority <br />Account Authority Appropriation <br />210-69-193 CIP Budget 17-18 Design $ 300,000 <br />Appropriation requested by this action in account 210-69-193-5120 $150,000 <br />Total $450,000 <br />Additional funding in FY 18-19 210-68-100 $2,500,000 <br />Additional funding will be required prior to the construction phase to complete the project. <br />Attachment to Related Legislative File <br />·Consulting Services Agreement with Noll & Tam Architects <br />PREPARED BY: John O’Driscoll, Associate Engineer, Engineering and Transportation <br />Department <br />Page 4 City of San Leandro Printed on 7/17/2018
The URL can be used to link to this page
Your browser does not support the video tag.