My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent 2018 0904
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0904
>
8L Consent 2018 0904
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2018 5:59:03 PM
Creation date
8/28/2018 5:59:03 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/4/2018
Retention
PERM
Document Relationships
Reso 2018-097
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: September 4, 2018 <br />Staff Report <br />Agenda Section:File Number:18-325 CONSENT CALENDAR <br />Agenda Number:8.L. <br />TO:City Council <br />FROM:Jeff Kay <br />City Manager <br />BY:Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW:David Baum <br />Finance Director <br />TITLE:Staff Report for a Resolution of the City Council for the City of San Leandro <br />Accepting the Work for the Annual Overlay/Rehabilitation 2016-17 Project Phase <br />1; Project No. 2017.0050 <br />SUMMARY AND RECOMMENDATIONS <br />This project reconstructed 4.2 lane miles of pavement throughout the City, including upgrades to <br />27 curb ramps to comply with Americans with Disabilities Act (ADA) requirements. <br />Staff recommends the City Council take the following actions: <br />·Accept the work; <br />·Direct staff to File the Notice of Completion; and <br />·Authorize the City Manager to release the performance and payment bonds, and to <br />release the maintenance bonds for the subject project upon successful completion of the <br />one-year maintenance period. <br />BACKGROUND <br />Each year the City completes pavement maintenance projects: Street sealing and street <br />overlay/rehabilitation. This staff report is for the Annual Overlay/Rehabilitation 2016-17 Project <br />Phase 1. <br />On July 17, 2017, by Resolution No. 2017-112, the City Council awarded a construction contract <br />to DeSilva Gates Construction, L.P. for the subject project. The contract completed repairs, <br />reconstruction, and/or overlay on a total of 4.2 lane miles of pavement on six City streets <br />segments, including upgrades to 27 curb ramps within the project’s limits to bring them into <br />compliance with ADA requirements. <br />In addition to the reconstruction of pavement, the contract reconfigured San Leandro Boulevard <br />from San Leandro Creek to West Broadmoor Boulevard by removing one vehicle lane in each <br />direction and adding buffers to the bike lanes. This change supports the City’s Complete Streets <br />Policy towards access for all roadway users. <br />Page 1 City of San Leandro Printed on 8/28/2018 <br />145
The URL can be used to link to this page
Your browser does not support the video tag.