My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent Calendar 2018 0917
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0917
>
8B Consent Calendar 2018 0917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 4:25:43 PM
Creation date
9/11/2018 4:25:43 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/17/2018
Retention
PERM
Document Relationships
Reso 2018-109
(Message)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 18-398 <br />·Transportation Goal T-7 Improve traffic safety and reduce the potential for collisions on San <br />Leandro streets <br />Environmental Review <br />This project is determined Categorically Exempt under 15303(c) of the California Environmental <br />Quality Act (CEQA). The Notice of Exemption was filed with the Alameda County Recorder on <br />May 29, 2015. <br />This project is determined to qualify for a Categorical Exclusion under Section 23 CFR <br />771.117(d) of the National Environmental Policy Act (NEPA). <br />Summary of Public Outreach Efforts <br />·The Notice to Bidders was published in the Daily Review, the South County Post, Visión <br />Hispana and the World Journal. <br />·Staff also notified twenty-one builders’ exchanges and construction data firms as well as a list <br />of contractors that asked to be notified of bidding opportunities via email. <br />·The project is described on the Engineering and Transportation Department website. <br />·City staff discussed the project from concept through design at the Bicycle and Pedestrian <br />Advisory Committee (BPAC) meetings on June 14, 2011; November 14, 2012; November 13, <br />2013; April 29, 2014; November 17, 2015; April 27, 2016; and November 9, 2016. <br />Fiscal Impacts <br />The total cost of the Bancroft-Sybil Intersection Improvements Project was $567,000, which <br />included design, construction management, inspection, and construction of the improvements. <br />The actual costs were less than the original $580,000 estimate reported to City Council on July <br />17, 2017. While all grant funds and Measure B funds assigned to the project were used, a <br />portion of the DFSI funds appropriated for the work were unused and will be returned to fund <br />balance. <br />A summary of the construction contract with W. Bradley Electric, Inc. is listed below: <br />Original Contract: $ 404,267 <br />Change Orders:$ 20,000 (4.95%) <br />Total Contract Amount:$ 424,267 <br />Page 3 City of San Leandro Printed on 9/11/2018
The URL can be used to link to this page
Your browser does not support the video tag.