My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action Calendar 2018 0917
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0917
>
10A Action Calendar 2018 0917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 4:29:06 PM
Creation date
9/11/2018 4:28:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/17/2018
Retention
PERM
Document Relationships
Reso 2018-116
(Message)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> 129 <br />SAN LEANDRO IMPLEMENTATION PLAN – NEXT STEPS <br /> <br />The recommended steps to implementing the Broadband Master Plan within the City are <br />provided below. <br /> <br />1. Review and Adopt the Broadband Master Plan <br />2. Finalize Strategy, Budgets and Timelines <br />3. Inventory Existing Assets <br />4. Design Engineering of the Outside Plant <br />5. Develop and Issue an RFP for Construction and Project Management <br />6. Engineer Operational Support Systems <br />7. Develop and Issue an RFP for O&M Contract <br /> <br />As the City continues to make progress in bringing this project to fruition, there are a <br />number of key tasks to consider that will validate the project’s cost structures and will <br />assist the City in planning for how these assets will be constructed and utilized. <br /> <br />The City should take the following next steps outlined below. <br /> <br />Review and Adopt the City of San Leandro’s Broadband Master Plan <br />City Management and elected leaders must have the opportunity to review, comment, <br />and provide direction on this Broadband Master Plan. The roadmap outlined in this <br />document requires funding and resources and should be vetted in this manner. <br />Construction and ownership of broadband infrastructure at this proposed scale will <br />include a major expansion of the existing conduit and fiber as outlined herein. The City <br />should designate this broadband effort as a City program, and it should be funded and <br />structured just like any other City enterprise. <br /> <br />Finalize Staging, Budgets, Timelines, and Develop Implementation Plan <br />City leadership will have to determine when funding can be committed to begin <br />construction of the network as outlined in this Plan. Before actual timelines are <br />identified, City leadership must provide details as to how and when this program will be <br />incorporated into the City’s overall plan and budget. <br />• Review funding requirements <br />• Develop budget and funding requests for project funding <br />• Develop implementation plan with project timelines, including all procurement <br />timelines and tasks <br /> <br /> Inventory Existing Broadband Assets <br />The City must audit existing conduit. There are some existing conduits that are suitable <br />for new fiber. These assets should be viewed as City communications assets and utilized <br />where possible.
The URL can be used to link to this page
Your browser does not support the video tag.