My WebLink
|
Help
|
About
|
Sign Out
Home
8N Consent 2018 1119
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 1119
>
8N Consent 2018 1119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2018 9:45:20 AM
Creation date
11/14/2018 9:45:20 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/19/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 18-552 <br />·Clean and reshape bunker edges <br />·Inspect and replace bunker drainage <br />·Treat bunker surfaces with Klinstone liner <br />·Install new G8 bunker sand <br />·Repair all disturbed areas around bunkers <br />The $900,000 noted for the clubhouse remodel was indicated more to acknowledge that a <br />remodel is needed, but also with the knowledge that it would take several years’ worth of CIP <br />funding to implement this project. The clubhouse, especially the interior, is worn and dated. The <br />exterior has not been painted in over 25 years; the carpet is 20+ years old; and the interior was <br />last painted in 2001. The proposed intermediate project, estimated at $125,000 would freshen up <br />the clubhouse interior and exterior. Proposed tasks include: <br />·Replace all clubhouse carpet with a hard surface material (more practical and easier to <br />maintain) <br />·Replace the sliding doors that divide the dining room from the small banquet room <br />·Paint the entire interior of the clubhouse <br />·Repair and paint the exterior of the entire clubhouse building <br />After completion of these two proposed projects, staff intends to return to the City Council for <br />consideration of a new 5-year CIP projects list. <br />Fiscal Impacts <br />Currently there is $485,000 in the Golf Course CIP Fund reserves. The total expense to complete <br />the two proposed projects should not exceed this amount. <br />The Shoreline Enterprise Fund (SEF) is supported by the Golf Course and other Marina <br />operating entities. As of June 30, 2018, the fund’s net position totaled $1.1 million (unaudited). <br />Budget Authority <br />The proposed projects will be funded through an authorized appropriation of $476,000 from the <br />Golf Course Capital Improvement Fund for Capital Improvements at Monarch Bay Golf Club in <br />Account No. 597-56-115 Golf Course CIP. <br />ATTACHMENT <br />None. <br />PREPARED BY: Debbie Pollart, Director, Public Works Department <br />Page 3 City of San Leandro Printed on 11/13/2018
The URL can be used to link to this page
Your browser does not support the video tag.