Laserfiche WebLink
www.forensicanalytical.com <br /> <br />Right People. Right Perspective. Right Now. <br /> <br /> <br />November 21, 2018 PROHA3203 / C4658 <br /> <br />To: Ms. Carla Kell-Smith <br />C. Kell-Smith and Associates <br />1250 Bayhill Drive, Suite 370 <br />San Bruno, CA 94066 <br />mgarg@tcco.co <br />Phone: 510-926-9101 <br /> <br />From: Wilson Wong <br />Forensic Analytical Consulting Services <br />21228 Cabot Boulevard <br />Hayward, CA 94545 <br />wwong@forensicanalytical.com <br />Phone: 510-266-4600 <br /> <br /> <br /> <br />Subject: Proposal for Asbestos & Lead Survey <br />8 Homes in San Leandro, California <br /> <br /> <br />Dear Ms. Kell-Smith: <br /> <br />Forensic Analytical Consulting Services, Inc. (FACS) is pleased to present this proposal for the <br />above referenced project, which consists of 8 homes in San Leandro, California (project buildings) in <br />support of the noise insulation project. <br /> <br />Client Objective(s) <br />Based on our correspondences, the following summarizes our understanding of your objectives: <br /> <br /> To identify asbestos- and lead-containing materials in the project buildings in support of the <br />noise insulation project <br /> Comply with regulatory requirements <br /> <br />Scope of Work <br />Subject to the attached terms and conditions, rates and the other provisions of this proposal, FACS <br />will provide the following services: <br /> <br />FACS will: <br /> Perform an asbestos and lead survey of the 8 project buildings (buildings to be identified <br />later) <br /> The survey will be performed by a California Certified Lead Inspector/Sampling Technician, <br />and Asbestos Consultant/ Site Surveillance Technician, and will meet the requirements of local <br />Air Quality Management District <br /> Submit samples to accredited laboratories for analysis. Asbestos samples will be analyzed by <br />Polarized Light Microscopy (PLM), lead samples by Atomic Absorption Spectrometry <br />(FlameAA), and PCB samples by EPA Method 8082A. All samples will be submitted for <br />standard (5 to 7 days) turnaround <br /> Prepare a written summary report with the findings of the survey <br /> Attend a project kick-off meeting