My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent Calendar 2019 0122
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0122
>
8G Consent Calendar 2019 0122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2019 6:13:31 PM
Creation date
1/17/2019 6:13:29 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
1/22/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and 12/18/2018 <br />Architectural Resources Group, Inc. (Casa Peralta PS&E) Exhibit A – Page 18 of 24 <br />Format of Deliverables <br /> Drawings shall be provided in AutoCAD or compatible CAD software. Consultant shall also <br />provide the pen-setting file, external reference files and any other files necessary to plot the plan <br />sheets correctly. <br /> Technical specifications shall be provided in Microsoft Word in CSI spec format <br /> Cost estimates shall be in Microsoft Excel <br /> <br />Fee Assumptions and Clarifications <br /> The Little Brown Church and its immediate site are not included in the scope of work. <br /> Scope includes the Tile Conservation Plan, but does not include comprehensive restoration of <br />decorative tile. <br /> Permit/Bid and Construction Administration phase services are not included in this scope. A <br />proposal for these service can be provided during design when scope and schedule are more <br />finely tuned. <br /> Consultant assumes a geotechnical report and hazardous materials testing report, if necessary, <br />will be provided by the City. A geotechnical consultant may be needed to determine the cause of <br />the subsidence of the fountain benches and provide foundation recommendations. <br /> Consultant recommends the City retain an arborist to assess existing trees on site due to their <br />size and age. <br /> Consultant has included a $10K civil engineering allowance should design be needed for site <br />drainage, utilities, or the lift. Until site design is further refined, an allowance allows the <br />Consultant to most efficiently plan for these unknowns. <br /> Graphic signage is limited to accessibility signs required by code. Specialty signs for exhibit or <br />wayfinding are not included in the scope of work. <br /> Meetings are limited to those listed in the Work Plan. <br /> Consultant understands the project will be competitively bid as a single drawing package. Should <br />the work need to be phased and separate drawing packages required, additional services might <br />be required. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.