My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent Calendar 2019 0122
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0122
>
8H Consent Calendar 2019 0122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2019 6:13:35 PM
Creation date
1/17/2019 6:13:31 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
1/22/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 18-643 <br />Fiscal Impacts <br />The total project cost for the East 14th and 144th Avenue HAWK signal is $204,700. Federal <br />grant funds amount to $184,230 and the City will provide matching funds from its Measure B <br />Bicycle and Pedestrian Funds in the amount of $20,470. Total for design phase of this project <br />$36,500 (grant funds $32,850 plus City’s required local match $3,650). <br />The total project cost for the scramble pedestrian signal at East 14th and Joaquin Avenue is <br />$372,500. Federal funds amount to $335,250 and the City will provide matching funds from its <br />Measure B Bicycle and Pedestrian Funds in the amount of $37,250. Total for design phase of <br />this project $66,500 (grant funds $59,850 plus City’s required local match $6,650). <br />Budget Authority <br />The East 14th Street (State Route 185) at Joaquin Avenue Scramble Pedestrian Signal project is <br />funded in 2017-18 as follows: <br />Account No.Resolution. Appropriation Date Amount <br />150-36-396 Res. 2017-072, June 5, 2017 $335,250 <br />144-38-396 Res. 2017-072, June 5, 2017 $ 37,250 <br />Total $372,500 <br />The East 14th Street at 144th Avenue High-intensity Activated Crosswalk (HAWK) Signal project <br />is funded in 2017-18 as follows: <br />Account No.Resolution. Appropriation Date Amount <br />150-36-397 Res. 2017-072, June 5, 2017 $184,230 <br />144-38-397 Res. 2017-072, June 5, 2017 $ 20,470 <br />Total $204,700 <br />Attachment to Legislative File <br />·CSA - TJKM Transportation Consultants for the Design Work of the East 14th Street/144th <br />Avenue and East 14th Street/Joaquin Avenue Signal Projects <br />PREPARED BY: Dean Hsiao, Traffic Operations Engineer, Engineering and Transportation <br />Department <br />Page 4 City of San Leandro Printed on 1/17/2019
The URL can be used to link to this page
Your browser does not support the video tag.