My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent Calendar 2019 0122
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0122
>
8I Consent Calendar 2019 0122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2019 6:13:38 PM
Creation date
1/17/2019 6:13:35 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
1/22/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Request for Authorization to Alter Highway-Rail Crossing Rev: 10-08-2015 <br />Pursuant to Commission General Order 88-B Page 1 of 5 <br />REQUEST TO CPUC STAFF FOR AUTHORIZATION TO <br />ALTER HIGHWAY-RAIL CROSSING PURSUANT TO GENERAL ORDER 88-B <br /> 1. Date Submitted: August 31, 2017 <br /> <br />2. Applicant Info <br />Organization Name: City of San Leandro <br />Contact Person: Michael Stella, P.E. <br />Title: Principal Engineer <br />Street Address: 835 East 14TH Street <br />City: San Leandro <br />Zip: 94577 <br />Phone: 510-577-3433 <br />Email: mstella@sanleandro.org <br /> <br />3. Crossing proposed to be altered <br />PUC Crossing Number: 001D-14.70 <br />U.S. DOT Crossing Number: 749728V <br />Street Name: Davis Street (State Route 112) <br />City: San Leandro <br />County: Alameda <br />Average Daily Vehicle Traffic <br />(ADT) on roadway crossing tracks <br />33,000 <br />Year ADT count taken (should be <br />within last 5 years) <br />2014 <br />Railroad Responsible for Crossing: Union Pacific Railroad <br />Other Railroads Operating on <br />Tracks: <br />Amtrak, BNSF <br />Average Daily Train Traffic and <br />speed from all operating railroads <br /> <br />Train Volume <br /> <br />Maximum Train Speed <br />Passenger 14 79 MPH <br />Freight 12 50 MPH <br />Transit 0 N/A <br /> <br /> <br />4. Describe Proposed Alterations (including any temporary reduced clearance variance requests): <br />Refer to the attached exhibit titled “San Leandro Tech Campus Davis Street Crossing DOT <br />#749728V San Leandro, California” by Lea & Braze Engineering, Inc. dated 8-01-2016. In general, the improvements include the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.