My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2019 0219
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0219
>
8E Consent 2019 0219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 6:36:26 PM
Creation date
2/13/2019 6:36:24 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/19/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 18-590 <br />The attached contracts represent the current understanding of the work required. From time to <br />time, changes to the scope of contracts are necessary to respond to new information or to include <br />additional items of work necessary for a complete product. In order to resolve these issues in a <br />timely fashion and avoid delaying work, staff requests authorization to issue individual contract <br />amendments to the consultant up to 10% each and cumulative contract amendments up to 20% of <br />the original value of each contract. <br />Current Agency Policies <br />·Maintain and enhance San Leandro’s infrastructure. <br />Previous Actions <br />·On February 20, 2018, by Resolution 2018-011, the City Council approved an agreement <br />with Wood Rodgers, Inc. for design of the Neptune Drive Flood Protection project. <br />·On March 3, 2008, by Resolution 2008-022, the City Council approved an agreement with <br />Keir and Wright for design of the Eden Road project. <br />Applicable General Plan Policies <br />·Policy EH-1.7 Work collaboratively with County, State, and federal agencies to develop <br />short and long-term programs that reduce flood hazards in the City. At the local level, the <br />City will regularly maintain its storm drainage system and ensure that those portions of San <br />Leandro Creek under its jurisdiction remain clear of obstructions. <br />·Action T-5.2.D Eden Road: As funding becomes available, complete the Eden Road <br />improvement project, including paving and sidewalk improvements, and improved <br />connectivity between Davis Street and Doolittle Drive. <br />Environmental Review <br />The Eden Road project was determined to be categorically exempt from CEQA in 2006. <br />When the design of the Neptune Drive project is sufficiently complete, a CEQA determination will <br />be made. If mitigation measures are required, they will be incorporated into the project. <br />Summary of Public Outreach Efforts <br />Public outreach to properties within each special finance district is included in the consultant’s <br />scope of work and will be performed as part of this project. <br />Page 3 City of San Leandro Printed on 2/13/2019
The URL can be used to link to this page
Your browser does not support the video tag.