My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2019 CSA C. Kell Smith & Asso. Phase 3 Airport Noise Insulation Program
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2019
>
Agmt 2019 CSA C. Kell Smith & Asso. Phase 3 Airport Noise Insulation Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:12:03 AM
Creation date
4/8/2019 9:40:21 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
1/7/2019
Retention
PERM
Document Relationships
10B Action Items 2019 0122
(Approved)
Path:
\City Clerk\City Council\Agenda Packets\2019\Packet 2019 0122
Reso 2019-008
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ma <br />C. Kell -Smith & Associates, Inc. <br />16060 @() 0 <br />723 Camino Plaza #181 <br />San Bruno, CA 94066 <br />650-827-3900 phone <br />www.kell-smith.com <br />Continuation of SOW <br />Conduct pre-bid conference <br />Prepare and conduct bid opening <br />Contractor review and reference check <br />Recommend for contract award <br />City Council approval of contractor: City of San Leandro SOW <br />Issue Notice of Award: City of San Leandro SOW <br />Execute construction contract: City of San Leandro SOW <br />Prepare and conduct pre -construction conference <br />Issue Notice to Proceed: City of San Leandro SOW <br />Review product cuts and shop drawings (Submittals) <br />Schedule and attend contractor measurement verification <br />Review material orders <br />RFI review/resolution/approval <br />RCP review/approval <br />Review/approve construction progress payments <br />Schedule and attend warehouse materials inspection <br />Schedule construction <br />Construction observation: City of San Leandro SOW <br />Schedule inspections <br />Perform substantial completion inspection: City of San Leandro SOW <br />Schedule/ inspect construction punch work: City of San Leandro SOW <br />Schedule/ inspect final inspections: City of San Leandro SOW <br />Weekly construction progress meetings <br />Weekly construction progress reports <br />Review certified. payroll records <br />Prepare final report <br />Review/approve as-builts <br />Review/approve warranties/maintenance bonds <br />Prepare/distribute homeowner warranty packets <br />Record legal Agreement: City of San Leandro SOW <br />City Council issue Notice of Completion: City of San Leandro SOW <br />Prepare/issue NOC: City of San Leandro SOW <br />Prepare/attend post project review meeting <br />Making Life a Little Quieter with Precision and Caring <br />
The URL can be used to link to this page
Your browser does not support the video tag.