Laserfiche WebLink
<br /> <br /> 3-1 <br />DRAFT Use of contents on this sheet is subject to the limitations specified at the end of this document. <br />Section 3 <br />Wastewater Capacity Unit Costs and <br />Capacity Charges <br />Capacity charges are developed based on unit costs for flow, BOD and SS. The unit costs for each <br />component are the value of the system allocated to each component divided by the capacity in the <br />system for each component. <br />3.1 Development of Unit Costs for Flow, BOD and SS <br />The unit costs for each capacity charge component are the value of the system allocated to each <br />component divided by the capacity in the system for each component. Allocation of wastewater system <br />valuation to each component and determination of the wastewater capacity were described in Section 2. <br />The development of unit costs for flow, BOD and SS based on those values are shown in the table below. <br /> <br />Table 3-1. Development of Unit Costs for Flow, BOD and SS <br /> <br /> <br />Using the unit costs for flow, BOD and SS, the capacity charge for any new connection may be <br />calculated. <br /> <br /> <br />Projected <br />Item 2018 2019 2020 2021 2022 2023 <br />Net System Valuation <br />Flow $222,021,750 $233,448,000 $245,311,500 $257,628,750 $270,416,250 $283,691,250 <br />BOD 37,003,625 38,908,000 40,885,250 42,938,125 45,069,375 47,281,875 <br />TSS 37,003,625 38,908,000 40,885,250 42,938,125 45,069,375 47,281,875 <br />Total $296,029,000 $311,264,000 $327,082,000 $343,505,000 $360,555,000 $378,255,000 <br />System Capacity <br />Flow, gpd 10,600,000 10,600,000 10,600,000 10,600,000 10,600,000 10,600,000 <br />BOD, lbs/day 41,471 41,471 41,471 41,471 41,471 41,471 <br />SS, lbs/day 39,186 39,186 39,186 39,186 39,186 39,186 <br />Unit Costs of Capacity <br />Flow, $/gallon $20.95 $22.02 $23.14 $24.30 $25.51 $26.76 <br />BOD, $/pound (rounded to $1) $892 $938 $986 $1,035 $1,087 $1,140 <br />SS, $/pound (rounded to $1) $944 $993 $1,043 $1,096 $1,150 $1,207