Laserfiche WebLink
DescriptionCurrent Fee Reference2019-20 PROPOSED FEES Explanation for FY 2019-20 Proposed FeesFIRE SERVICE RELATED – GENERAL 1Fire Prevention Fees A. Fire Permit Filing and Issuance Fee $119.00 plus applicable Fire Permit Fees$124 plus applicable Fire Permit FeesB. Fire Permit Re-inspection Processing Fee 50% of Fire Permit filing and issuance feeLeave fee unchanged. Percent of other fee.C. Fire Plan Storage$28.50 $30 2 PermitsSLMC 3-3-112A. Fire Code Permit Fees$259.00$2693 Sprinkler Fees:SLMC 3-3-260A. Underground/Private Service Fire Main (includes plan review, hydrostatic test, flush, & inspections $713.00 plus $17.24/hydrant or connection fee$741 plus $18/hydrant or connection feeB. Sprinkler System (system = 1 riser) (includes plan review, weld, hydrostatic test & inspections <2) $713.00 plus $0.61 per hydrant or connection$741 plus $1 per headC. Any extraordinary situations charged at $130.00/hr$135/hrD. Automatic Sprinkler Tenant Improvements: -- Less than 20 heads $259.00$269 -- Greater than or equal to 20 heads $389.00$4044 Fixed Fire Protection SystemSLMC 3-3-250A. Plan check, inspection and test $259.00$269B. Electronics activation (clean agent, pre action, etc.) $389.00 plus $5.40 per device$404 plus $6 per deviceC. Any retest or re-inspection (1) $130.00/hr$135/hr5 Fire AlarmsSLMC 3-3-250A. Property protection, plan check and test $130.00 plus $3.24/initiating and/or indicting device $135 plus $3/initiating and/or indicting B. Life Safety Systems $259.00 plus $5.40 per device $269 plus $6 per device C. Any retest or re-inspection (1)$130.00/hr$135/hr6 Hazardous Materials Response and Other Incident FeesSLMC 3-3-300A. Engine or Truck Company$315/hr$327/hrB. Chief Officer$105/hr$109/hr7 Inspection of Multiple Family Dwellings (3 or more units)CA Health & Safety Code A. Annual $130.00/hr (1) $135/hr (1) 8 MiscellaneousA. All other plan reviews (includes review and ordinary inspections associated with project) 65% of bldg permit fee (2) B. Other Fire Prevention Services (includes any miscellaneous fire protection related activities not Direct Cost (2) (3)C. Excessive Plan Review and Inspections $130.00/hr$135/hrD. Fire Investigation Fee$601.00 $624(1) 1 hour minimum(2) The City Manager and/or Fire Chief may adjust the plan checking/permit fee for an individual project when costs to the City are not congruent with this fee schedule.(3) Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs. 14