Laserfiche WebLink
CONTRACT PRICE SCHEDULE <br />Item <br />Description <br />Estimated <br />Unit of <br />Item UNIT Price <br />Item UNIT Price <br />TOTAL <br />No. <br />Quantity <br />Measure <br />(in Words) <br />(in Figures) <br />PRICE <br />(A) <br />(B) <br />(in Figures) <br />(AxB) <br />Mobilization, Staging & <br />Ten Thousand Dollars <br />$10,000.0 <br />$10,000.00 <br />1. <br />Stockpiling per <br />1 <br />LS <br />Sections 7-8.4 & 9-3.4 <br />Temporary Traffic <br />Ten Thousand Dollars <br />$10,000.0 <br />$10,000.00 <br />2' <br />Control per Section <br />1 <br />LS <br />600 <br />Install Curb and Gutter <br />Eighty -Five Dollars <br />$85.00 <br />$146.030.00 <br />3. <br />per City Standard Plan <br />1,718 <br />LF <br />No. 100 <br />Install Wheelchair Curb <br />Forty -One Dollars <br />$41.00 <br />$428,819.00 <br />4 <br />Cut Ramp per City <br />10,459 <br />SF <br />Standard Plan Nos. <br />106A and 106B <br />Install Sidewalk per <br />Thirty Dollars <br />$30.00 <br />$42,120.00 <br />5. <br />City Standard Plan No. <br />1,404 <br />SF <br />100 <br />Install Concrete Apron <br />Forty -One Dollars <br />$41.00 <br />$21,904.00 <br />6. <br />per City Standard Plan <br />534 <br />SF <br />No. 114 <br />7' <br />Install Concrete Valley <br />Fifty Dollars <br />$50.0 <br />$9,900.00 <br />Gutter City Standard <br />198 <br />SF <br />Plan No. 114 <br />Install Asphalt Concrete <br />Thirty Dollars <br />$30.00 <br />$37,010.00 <br />8 <br />Tie-ins per City <br />1,567 <br />CF <br />Standard Plan Nos. 100 <br />& 114 <br />9. <br />Adjust Utility Box to <br />12 <br />EA <br />Three Hundred Dollars <br />$300.00 <br />$3,600.00 <br />Grade per 301-1.6 <br />Relocate Roadside <br />Four Hundred Dollars <br />$400.00 <br />$2,400.00 <br />10. <br />Sign and Post per <br />6 <br />EA <br />Sections 315 <br />Relocate Roadside Sign <br />Five Hundred Dollars <br />$500.00 <br />$2,500.00 <br />11. <br />on New Post per <br />5 <br />EA <br />Sections 315 <br />12 <br />Paint Curb Red per 314- <br />Five Thousand Dollars <br />$5,000.00 <br />$5,000.00 <br />4 <br />1 <br />LS <br />Install New Pedestrian <br />Two Thousand Dollars <br />$2,000.00 <br />$6,000.00 <br />13. <br />Push Button Post per <br />3 <br />EA <br />Sections 701-10 <br />Install New Pedestrian <br />Nine Hundred Dollars <br />$900.00 <br />$2,700.00 <br />14. <br />Push Assembly per <br />3 <br />EA <br />Section 701-13 <br />Relocate Existing <br />One Thousand Seven <br />$1,700.00 <br />$23,800.00 <br />15. <br />Pedestrian Push Button <br />14 <br />EA <br />Hundred Dollars <br />Assembly per Section <br />701-13 <br />16. <br />Install Pull box per <br />2 <br />EA <br />Five Hundred Fifty Dollars <br />$550.0 <br />$1,100.00 <br />Section 701-11 <br />Last Revised: 06/01/16 Page 5 Agreement <br />Curb Ramp Upgrades 2018-19 Project No. 2019.0070 <br />