My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2019080139
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2019
>
Inst 2019080139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:08:50 AM
Creation date
5/30/2019 5:52:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/1/2019
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
conform to the Model Water Efficient Landscape Ordinance as updated by the <br />State of California Department of Water Resources. <br />E. Prior to issuance of building permits, the developer shall submit final plans and <br />details for the site lighting and specific street lighting details regarding location, <br />candle power, and light levels (by submittal of a photometric study) for the <br />review and approval of the City Engineer and Community Development <br />Director. The plans and details shall show location, height, decorative features, <br />and construction details showing materials and finishes to be used for <br />construction. No site lighting may spill offsite or create glare offsite. <br />F. Prior to issuance of building permits, the developer shall submit final sign plans <br />and details showing use, location, and height of all site signage for the review <br />and approval by the Community Development Director. <br />G. Prior to issuance of any Certificate of Occupancy on the property, the <br />improvements outlined above shall be completely installed to the satisfaction <br />of the Community Development Director and the City Engineer. <br />H. The final public art element proposal shall be submitted to Community <br />Development Director for review prior to issuance of a Certificate of <br />Occupancy. The public art element will be reviewed prior to issuance of a <br />building permit if a building permit is required for the public art element prior to <br />installation. <br />IV. BUILDING AND SAFETY SERVICES REQUIREMENTS <br />A. The project shall meet all Residential CalGreen requirements. <br />B. Building permit plans shall include Accessible ready units. <br />C. Building permit plans shall show Accessible path of travel from Accessible <br />parking spaces. <br />D. Building permit plans shall show all mechanical units and provide all the details <br />and specifications to how and what each mechanical unit is servicing (i.e., <br />mechanical venting). <br />E. Building permit plans shall show occupancy and exiting that satisfies required <br />Building and Fire Codes. <br />F. Title 24 Building Energy Efficiency shall be satisfied. <br />G. Structural Calculations shall be provided. <br />V. ENGINEERING AND TRANSPORTATION DEPARTMENT REQUIREMENTS <br />Agreement to Conditions March 7, 2019 <br />PLN 18-0013 Page 6 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.