My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent 2019 0617
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0617
>
8K Consent 2019 0617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 3:18:49 PM
Creation date
6/12/2019 6:57:20 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/17/2019
Retention
PERM
Document Relationships
Ord 2019-011 PAD
(Approved)
Path:
\City Clerk\City Council\Ordinances\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3. If high priority for PCBs-containing building materials based on the structure age, use, <br /> and construction, the concentration of PCBs in each Priority Building Materials present. <br /> If PCBs concentrations are determined via representative sampling and analysis, include <br /> a contractor’s report documenting the assessment which includes the completed QA/QC <br /> checklist from the Protocol for Assessing Priority PCBs-Containing Materials before <br /> Building Demolition and the analytical laboratory results. <br /> 4. For each Priority Building Material present with a PCBs concentration equal to or <br /> greater than 50 ppm, the approximate amount (linear feet or square feet) of that material <br /> in the building (see Applicant Package for more details). <br /> 5. Applicant’s certification of the accuracy of the information submitted. <br />(b) The Building Division of the Community Development Department may specify a format or <br />guidance for the submission of the information. <br />Section 9. Recordkeeping <br />Those Applicants conducting a building demolition project must maintain documentation of the <br />results of the PCBs in Priority Building Materials Screening Assessment for a minimum of five <br />years after submittal. <br />Section 10. Obligation to Notify the City of San Leandro of Changes <br />The Applicant shall submit written notifications documenting any changes in the information <br />submitted in compliance with this Article. <br />The Applicant shall submit the revised information to the Building Division of the Community <br />Development Department when changes in project conditions affect the information submitted <br />with the permit application. <br />Section 11. Liability <br />The Applicant is responsible for safely and legally complying with the requirements of this <br />Article. Neither the issuance of a permit under the requirements of Chapter 7-5, Article 1, <br />Section 105.1 et seq., nor the compliance with the requirements of this Article or with any <br />condition imposed by the issuing authority, shall relieve any person from responsibility for <br />damage to persons or property resulting there from, or as otherwise imposed by law, nor impose <br />any liability upon the City of San Leandro for damages to persons or property. <br />Section 12. Enforcement <br />Failure to submit the information required in this Article or submittal of false information will <br />result in enforcement under Chapter 7-5, Article 1, Section 104.1 et seq. <br />Section 13. Fees <br />225
The URL can be used to link to this page
Your browser does not support the video tag.