Laserfiche WebLink
period (in which the applicant may protest the imposition of any fees, dedications, <br />reservations, or other exactions imposed on this Project by these Conditions of <br />Approval) will begin on the date of the conditional approval of this Project. If you <br />fail to file a protest within this 90 -day period, complying with all of the <br />requirements of Government Code Section 66020, you will be legally barred from <br />later challenging any such fees, dedications, reservations or other exactions. <br />E. The applicant shall implement construction best management practices during <br />construction to control erosion, keep sediment from leaving the project site and <br />prevent storm water pollution. Building Permit plans shall show these measures <br />on plans. <br />F. A Grading Permit will be necessary for the project. The requirements for said <br />permit are indicated in San Leandro Municipal Code §7-12. The permit will be <br />issued prior to or concurrent with the Building Permit. The San Leandro <br />Municipal code can be found at <br />https•//www sanleandro org/documents/En ink eerin /Gg radina%2OPermit%20appli <br />cation.pdf. The geotechnical engineer of record shall certify that the design of site <br />improvements conforms to recommendations from the Geotechnical <br />Investigation. <br />G. Add below notes to the Building Permit Plans: <br />a. The applicant shall obtain an Encroachment Permit from the Engineering and <br />Transportation Department for any work within the public right-of-way <br />including the use of lifting equipment or the staging of materials. Barricades, <br />traffic cones, and/or caution ribbon shall be positioned around any equipment <br />or materials within the right-of-way to provide a barrier to public access and <br />assure public safety. Any damage to the right-of-way improvements must be <br />promptly repaired by the applicant according to City adopted standards. <br />b. The applicant shall comply with the following high standards for sanitation <br />during construction of improvements: garbage cans, construction dumpsters, <br />and debris piles shall be removed on a minimum weekly basis. All food <br />related trash items such as wrappers, cans, bottles, and food scraps shall be <br />disposed of in closed containers only and shall be regularly removed from the <br />site. Inspections, conducted as part of the regular construction compliance, <br />will be conducted to ensure compliance of the Applicant and contractors with <br />this requirement. <br />c. The applicant shall implement construction best management practices during <br />construction to control erosion, keep sediment from leaving the project site <br />and prevent storm water pollution. The applicant shall protect existing storm <br />drain inlets and conveyances within the project area to prevent sediment from <br />construction activities entering the storm drain system. <br />d. All on-site storm drains shall be inspected and cleaned if necessary, at least <br />twice a year including immediately prior to the rainy season. <br />IV. FIRE DEPARTMENT REQUIREMENTS <br />A. New or Modifications to the fire protection requires a "Deferred Submittal". <br />Agreement to Conditions June 27, 2019 <br />PLN17-0072 Page 6 of 11 <br />