Laserfiche WebLink
PLN17-0069 874 Lewelling Blvd - 6-Unit Townhome Development - Zoning Amendment, Planned Development, Site Plan Review, Tentative Map <br />EXHIBIT E - DEMOLITION PLAN <br />LEWELLING BLVD. <br />N orth <br />DEMOLITION PLAN, KEYNOTES <br />(E) DRIVEWAY <br />(E) RESIDENCE TO BE DEMOLISHED <br />(E) SHED TO BE DEMOLISHED <br />(E) SURROUNDING 2-STORY TOWNHOMES, ZONE <br />RM-1800, NOT PART OF THIS PROJECT <br />(E) SURROUNDING 1 STORY-CHURCH, ZONE RS, <br />NOT PART OF THIS PROJECT <br />(E) GRAVEL DRIVEWAY TO BE RENOVATED <br />(E) TREE TO BE REMOVED <br />1 <br />2 <br />32 <br />RM-1800 <br />2-STORY TOWNHOMES <br />4 <br />4 <br />5 <br />RM-1800 <br />2-STORY <br />TOWNHOMES <br />RS <br />1-STORY CHURCH <br />5 <br />RS <br />1-STORY CHURCH <br />5 <br />4 <br />6 <br />6 <br />DEMOLITION PLAN NOTES <br />1.PRIOR TO GRADING, STRUCTURES AND THEIR CONTENTS SHALL <br />BE REMOVED OR DEMOLISHED UNDER PERMIT IN AN <br />ENVIRONMENTALLY SENSITIVE MANNER. PROPER EVALUTATION,ANALYSIS AND DISPOSAL OF MATERIALS SHALL BE DONE BY <br />APPROPRIATE PROFESSIONAL(S) TO MITIGATE HAZARDS. <br />2.ALL SUBSURFACE STRUCTURES SHALL BE REMOVED PROPERLY IN <br />ORDER NOT TO POSE THREAT TO THE DEVELOPMENTCONSTRUCTION WORKERS, FUTURE RESIDENTS OR THE <br />ENVIRONMENT. THESE STRUCTURES SHALL BE DOCUMENTED <br />AND REMOVED UNDER PERMIT WHEN REQUIRED. <br />3.THE SAN LEANDRO FIRE DEPARTMENT'S HAZARDOUS MATERIALS <br />OFFICE SHALL BE NOTIFIED IMMEDIATELY IF HAZARDOUS <br />MATERIALS OR ASSOCIATED STRUCTURES ARE DISCOVERED <br />DURING DEMOLITION DURING GRADING. THESE STRUCTURES <br />SHALL INCLUDE, BUT SHALL NOT BE LIMITED TO: ACTUAL <br />HAZARDOUS MATERIALS, UNDERGROUND TANKS, OR OTHER <br />VESSELS THAT MAY HAVE CONTAINED HAZARDOUS MATERIALS. <br />4.FIRE HYDRANTS AND FIRE LANES FOR THE DEVELOPMENT SHALLBE OPERATIONAL AND IN SERVICE PRIOR TO THE START OF ANY <br />COMBUSITBLE CONSTRUCTION AND /OR STORAGE OF <br />COMBUSTIBLE CONSTRUCTION MATERIALS. <br />CONSTRUCTION HOURS: ______ AM TO ______PM <br />EMPLOYEE PARKING <br />CONSTRUCTION STAGING <br />7 <br />8 <br />9 <br />8 9 <br />RM-1800 <br />2-STORY TOWNHOMES <br />4 ATTS <br />LAC <br />E <br />FO ILICENS E D ARCHIT <br />ECTF O RNIAGORD KONW <br />GNO <br />RENEWAL 08/17/2015 <br />4 0 4 53-C <br />Project Schedule RevisionSan Leandro, CA 94579874 Lewelling BoulevardSCALE Lewelling CondominiumsR E S I D E N T I A L / C O M M E R C I A LGKW ARCHITECTS, INC. AIA, LEED GA710E MCGLINCY LANE SUITE 109CAMPBELL CA 95008(408) 315-2125 LIC# 34045,WWW.GKWARCHITECTS.COMPROJECT REPRESENTATIVESJENNY C. WONG & WEIRAN JIA710E MCGLINCY LANE SUITE 109CAMPBELL, CA 95008(408) 796-1845 | WWW.GKWARCHITECTS.COMRENEWAL 08/17/2019 <br />1 <br />No.Date Description <br />2018.08.08 Planning <br />2 2019.01.07 Planning <br />3 2019.03.25 Planning <br />4 2019.07.11 Planning <br />7/10/2019 6:05:55 PM <br /> 1/16" = 1'-0" <br />G005 <br />Demolition Plan & NotesDemolition Plan & Notes0'8'16'32'64' <br /> 1/16" = 1'-0"2 Demolition Plan <br />23