Laserfiche WebLink
Recommended Conditions of Approval November 4, 2019 <br />PLN17-0069 874 Lewelling Blvd. Page 10 of 12 <br />53. BAAQMD Best Management Practices. Project’s construction contractor shall <br />comply with the current Bay Area Air Quality Management District (BAAQMD) Best <br />Management Practices for reducing construction emissions of PM10 and PM2.5. <br />54. Asbestos Management. The project contractor(s) shall conduct a comprehensive, pre- <br />demolition ACM survey in accordance with the sampling protocol of the Asbestos <br />Hazard Emergency Response Act (AHERA) prior to any activities with the potential to <br />disturb building materials to determine whether ACM are present. In the event ACM is <br />present, ACM’s must be properly abated and disposed of. <br />55. Dust and Noise. Construction activity shall not create dust, noise or safety hazards for <br />adjacent residents and properties. Dirt and mud shall not be tracked onto Lewelling <br />Boulevard from the project site during construction. All construction contracts shall <br />include the following requirements: 1) Unpaved construction sites shall be sprinkled <br />with water at least twice per day; 2) Trucks hauling construction materials shall be <br />covered with tarpaulins or other effective covers; 3) Streets surrounding demolition and <br />construction sites shall be swept at least once per day; and 4) Paving and planting shall <br />be done as soon as possible. City shall charge developer, and developer shall pay, for <br />all costs of sweeping city streets in the vicinity of the project as necessary to control dust <br />and spillage. <br />55.1. Dust. Standard construction dust control procedures, such as wetting, daily road <br />washing and other maintenance functions to control emissions, shall be <br />implemented at all times during outdoor construction. Dust generating activities <br />such as grading, excavation, paving etc., shall be scheduled the early morning <br />and other hours when wind speeds are low. All construction activities entailing <br />soil disturbance shall cease when winds exceed 30 miles per hour as an hourly <br />average. <br />55.2. Noise. Procedures with the highest noise potential shall be scheduled for daylight <br />hours, when ambient noise levels are highest. The contractor(s) shall be required <br />to employ the quietest among alternative equipment or to muffle/control noise <br />from available equipment. <br />56. Truck Route Plan. The developer shall prepare a construction truck route plan that <br />would restrict trucks to arterial streets that have sufficient pavement section to bear the <br />heavy truck traffic, thereby minimizing noise and traffic impacts to the community. The <br />construction truck route plan shall be reviewed and approved by the City Traffic <br />Engineer prior to receipt of the grading permit. <br />57. Truck Hauling Hours. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 <br />p.m. There shall be no truck hauling activity on Saturdays, Sundays and legal holidays. <br />58. Maintenance. During the construction phase, the site shall be well maintained in a neat <br />manner, free of weeds, litter and debris. <br />59. Secure Construction Site. The property shall be secured during construction with a six <br />(6) foot high chain link fence and any other security measures in accordance with <br />recommendation of the San Leandro Police Department. <br />60. Pest and Vermin Control. Pest and vermin control shall be instituted prior to the <br />demolition and construction of the project.