Laserfiche WebLink
Waiver of Subrogation Endorsement as required by the section; <br />and <br />d. Primary Insurance Endorsement as required by the section. <br />4.3 Professional Liability Insurance. <br />4.3.1 General Requirements. Consultant, at its own cost and expense, shall <br />maintain for the period covered by this Agreement professional liability <br />insurance for licensed professionals performing work pursuant to this <br />Agreement in an amount not less than $2,000,000 covering the licensed <br />professionals' errors and omissions. Any deductible or self-insured <br />retention shall not exceed $150,000 per claim. <br />4.3.2 Claims -Made Limitations. The following provisions shall apply if the <br />professional liability coverage is written on a claims -made form: <br />a. The retroactive date of the policy must be shown and must be <br />before the date of the Agreement. <br />b. Insurance must be maintained and evidence of insurance must be <br />provided for at least 5 years after completion of the Agreement or <br />the work; so long as commercially available at reasonable rates. <br />If coverage is canceled or not renewed and it is not replaced with <br />another claims -made policy form with a retroactive date that <br />precedes the date of this Agreement, Consultant shall purchase <br />an extended period coverage for a minimum of 5 years after <br />completion of work under this Agreement. <br />d. A copy of the claim reporting requirements must be submitted to <br />the City for review prior to the commencement of any work under <br />this Agreement. <br />4.3.3 Additional Requirements. A certified endorsement to include <br />contractual liability shall be included in the policy. <br />4.3.4 Submittal Requirements. To comply with Subsection 4.3, Consultant <br />shall submit the Certificate of Liability Insurance in the amounts specified <br />in the section. <br />4.4 All Policies Requirements. <br />Consulting Services Agreement between City of San. Leandro and Last revised September 10, 2019 <br />Terraphase Engineering for Treatment Wetland Design Services Page 8 of 18 <br />