EXHIBIT A <br />SCOPE OF SERVICES <br />Task Authorization <br />Tasks 1.1 through 4.1 below are authorized upon issuance of the Notice to Proceed. The <br />remaining tasks may be authorized following Task 3, when conceptual design is completed. In <br />addition, the scope of Task 4.2 may be modified to include fewer regulatory agencies pending <br />meetings in September or October, 2019. Tasks will be authorized via written work orders from <br />City staff. <br />Task Durations <br />The Terraphase Team commits to the listed task durations if the project proceeds as described <br />below. However, timelines may need to be extended for circumstances outside of Terraphase',s <br />control, such as delays from regulatory agencies. <br />TASK 1— PROJECT ADMINISTRATION AND MANAGEMENT <br />(24 MONTHS, PROJECT DURATION) <br />TASK 1.1— PROJECT INITIATION PLANNING AND PROJECT KICK-OFF MEETING <br />The Terraphase Team will review and use available site background documents, initial <br />conceptual design elements, and the Project objectives to prepare for the initial Project kick-off <br />meeting. We will provide a detailed workflow diagram for Phased and Phase II within 10 <br />working days from issuance of the Notice to Proceed identifying key decision points and <br />deliverables, as well as an associated updated schedule. <br />The Terraphase Team Project manager (Lucas Paz) and key technical leads (Scott Wallace, Hans <br />Kramer and Megan Stromberg) will prepare an outline presentation and participate in an initial <br />Project kickoff meeting with the City and Project stakeholders (timing to be determined by the <br />City in consultation with SFBRA). The kickoff meeting will be held by, at the latest, the second <br />month of the Project. The meeting will include an overview of the proposed work plan, <br />discussion of existing site constraints and proposed site data acquisition, discussion of the initial <br />conceptual design, and consideration of potential design alternatives and permitting challenges <br />and strategy. The meeting will identify remaining steps required to collect necessary baseline <br />information to support the design development and to address known data gaps. <br />DELIVERABLES: <br />Kick-off meeting presentation <br />Workflow diagram for Phase I and Phase II (through Task 6) <br />TASK 1.2 - PROJECT MANAGEMENT, COMMUNICATION AND COST CONTROL <br />The Terraphase Team will prepare for and lead bi-weekly or monthly Project update conference <br />calls with the City after the Project is underway and throughout the Project. Lucas Paz will serve <br />as the overall Project manager and will be assisted by Hans Kramer, the engineering design <br />Consulting Services Agreement between City of San Leandro and Last revised September 10, 2019 <br />Terraphase Engineering for Treatment Wetland Design Services Exhibit A — Page 19 of 38 <br />