My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2019-160
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2019
>
Reso 2019-160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 12:32:33 PM
Creation date
12/6/2019 12:32:06 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
10/7/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
development lead, and by Morgan O'Hare and Tomer Schetrit for general engineering, project <br />management, and administrative support. <br />The following Project management activities will be conducted throughout the duration of the <br />Project: <br />• Supervise, coordinate, and monitor design development for conformance with <br />standard engineering practices and other governing agency requirements. <br />• Notify the City of any changes in scope or budget as soon as possible, and propose <br />actions, if necessary, to correct these changes. <br />• Provide responsive communication to the City by being available by phone or e-mail <br />and responding in a timely fashion. Bi -weekly/ monthly Project status conference <br />calls are proposed. <br />• Maintain Project files and provide monthly progress reports and invoices to the City, <br />over the duration of the Project, consistent with SFBRA's Measure AA administration <br />requirements and the City of San Leandro's contract requirements. Monthly <br />reporting will summarize work completed during the monthly invoicing period, <br />including deliverables, an invoice detailing costs and staff hours by task, and a <br />budget tracking table showing progress by task. <br />We will maintain project cost control using our internal project management and cost <br />accounting system database (Ajera). This accounting system provides real-time updates on <br />Project costs and expenses to track spending and to ensure that the work scope is completed <br />within budget. <br />DELIVERABLES: <br />As -needed bi-weekly/monthly progress meetings or conference calls <br />Invoices with monthly progress updates for each task, including work by <br />subconsultants <br />TASK 2 — DATA & INFORMATION COLLECTION (TASK DURATION: 27 WEEKS) <br />TASK 2.1- REVIEW OF SITE PHYSICAL AND ENVIRONMENTAL DATA AND PREVIOUS PROJECT <br />FINDINGS <br />The Terraphase Team will review relevant site background data and reports (i.e., geotechnical <br />and environmental data), available drawings of the existing wastewater treatment plant <br />facilities, plant discharge data, and other supporting information. We will also review detailed <br />design documents, findings and lessons learned from previous treatment wetland projects, <br />including the Oro Loma Horizontal Levee Project, the Discovery Bay Treatment Wetland Project, <br />the Los Prados Wetland Project, and the numerous treatment wetlands projects designed and <br />previously implemented by the Terraphase Team members. The site background data and <br />findings from previous treatment wetland projects will be used to inform the design <br />development. Terraphase's Geotechnical Engineer (Jeff Raines) will review existing geotechnical <br />studies to determine the availability of information necessary to complete the design and to <br />identify data gaps. The initial information required to inform the design process includes <br />Consulting Services Agreement between City of San Leandro and Last revised September 10, 2019 <br />Terraphase Engineering for Treatment Wetland Design Services Exhibit A — Page 20 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.