Laserfiche WebLink
topographic survey data, site soils/geology data, infrastructure locations, wastewater effluent <br />quality, and land ownership details. <br />DELIVERABLES: <br />Summary compilation of previous data, design drawings/details and report sources <br />collected and reviewed to support the design development. <br />TASK 2.2 — COLLECTION OF SITE TOPOGRAPHY AND UTILITY DATA <br />Towill, Inc., in coordination with the lead Terraphase Civil Engineer (Hans Kramer) will conduct <br />professional surveying services to augment existing topography and investigate property <br />boundary, utility, easement and land ownership constraints. Towill previously performed <br />surveying and mapping at the San Leandro WPCP in 2009 and 2016, and at the neighboring <br />basin in 2008. Detailed site topographic and boundary surveying will support development of <br />the base map for the construction design drawings, will determine and verify specific tie-in <br />locations, and will identify specific landscape features such as existing levee cross-sections. <br />A combination of global positioning system (GPS) technology and conventional land surveying <br />equipment and techniques will be employed to establish horizontal and vertical control. Utility <br />locations will be field surveyed and reflected in the updated topographic mapping. Property <br />corners and easements will be researched and identified. Results of a title search will be <br />provided identifying easements, covenants, use restrictions, or other encumbrances on the <br />property. A detailed topographic survey of the Site will be performed including additional <br />coverage in adjacent areas immediately outside the Project limit of work. The field survey will <br />pick up all the surface and visible underground improvements throughout the Site to facilitate <br />the Project design and to support potential future site improvements. Utility line locating <br />and/or potholing will be provided to accurately identify existing utilities throughout the site. <br />We will survey all locations/alignments, rims, grates and invert elevations of all visible sanitary <br />sewer and storm drain structures within the Site, and immediately upstream and downstream <br />of the existing infrastructure inlet and outlet points, based on the established datum and local <br />control points. <br />DELIVERABLES: <br />• Summary of ground (photo) control coordinates and brief descriptions of the points <br />including the primary control monuments used as the basis for our horizontal and <br />vertical surveys. <br />• Condition of Title Report <br />• Set of 1,000 dpi copies of the aerial photography site imagery in JPEG format <br />• Site topography, utility and property survey in AutoCAD format (including boundary <br />lines and easements) [AutoCAD drawing files and/or MicroStation design files <br />containing the digital plan imetric/topographic map and digital terrain data] <br />• Existing conditions site plan and base map for construction design drawings <br />TASK 2.3 — ASSESSMENT OF SITE OPPORTUNITIES AND CONSTRAINTS AND EXISTING DATA <br />GAPS <br />Consulting Services Agreement between City of San Leandro and Last revised September 10, 2019 <br />Terraphase Engineering for Treatment Wetland Design Services Exhibit A — Page 21 of 38 <br />