My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2019-160
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2019
>
Reso 2019-160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 12:32:33 PM
Creation date
12/6/2019 12:32:06 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
10/7/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DELIVERABLES: <br />Preliminary Design Report <br />TASK 3 — DEVELOP 30% PLANS, SPECIFICATIONS AND ESTIMATES (PS&E) [TASK DURATION: 12 <br />WEEKS] <br />TASK 3.1— PREPARATION OF 30% DESIGN PLANS/ CONSTRUCTION DOCUMENTS <br />The Terraphase Team will advance the preferred alternative to develop design materials <br />representing 30% Project definition, consisting of grading plans, landscape drawings, utility and <br />design drawings and details. All plan drawings, details and sections will be developed in digital <br />format using AutoCAD. Kelly Lam will serve as lead CAD designer under the supervision of Hans <br />Kramer, Lucas Paz, Scott Wallace, and Jeff Raines. <br />The Terraphase Team will develop grading plans showing plan and profile of the proposed <br />treatment wetland and embankments, utility alignments, and detailed construction sections. <br />Re -vegetation plans and associated landscape drawings and details will also be developed for <br />selected areas in the Project site. The landscaping design will involve development of a <br />customized plant palette and planting plan for the site to support hand -planting of native <br />species, to be developed with expert input. The customized planting plan and an approved list <br />of recommended native plant species for the Project will be developed by our landscaping <br />expert, Megan Stromberg (professional landscape architect and wetland revegetation <br />specialist), detailing areal placement of plant installations and seeding specifications for the <br />respective Project area to address both the wetland treatment and habitat creation objectives. <br />Terraphase will prepare a preliminary list of drawings to be prepared to illustrate the basic <br />scope and approach prior to producing the 30% plan set. Drawings will be prepared in <br />AutoCAD, following agreed-upon drafting standards. We will provide design drafts provided to <br />the City for review and comment, incorporating City feedback into the design documents prior <br />to presentation. <br />The Terraphase Team will also prepare and conduct presentations to review the draft design <br />documents with Project proponents, at which point stakeholder consultation and feedback will <br />be garnered. Drafts will be provided at least fourteen days prior to corresponding <br />presentations. Terraphase will incorporate feedback from Project stakeholders into subsequent <br />drafts and materials. <br />The Terraphase Team will produce the completed 30% design with corresponding visual <br />exhibits and present to Project proponents, other stakeholders, and/or regulators, at up to two <br />meetings, to inform next steps for the Project. <br />DELIVERABLES: <br />Preliminary Review Drafts of 30% Plans <br />30% Design Plans/Construction Documents <br />TASK 3.2 — PREPARATION OF PRELIMINARY SPECIFICATIONS AND COST ESTIMATES <br />Terraphase will prepare an outline of specifications and a preliminary bid schedule in tandem <br />with the 30% design development. Technical specifications will be prepared in an agreed-upon <br />Consulting Services Agreement between City of San Leandro and Last revised September 10, 2019 <br />Terraphase Engineering for Treatment Wetland Design Services Exhibit A — Page 24 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.