My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2019-171
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2019
>
Reso 2019-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 12:33:43 PM
Creation date
12/6/2019 12:32:56 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
10/21/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Checklist <br />Utilities and Service Systems <br /> <br />General Plan Consistency Checklist 89 <br />LESS THAN SIGNIFICANT OR LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED <br />d. Generate solid waste in excess of State or local standards, or in excess of the capacity of local <br />infrastructure, or otherwise impair the attainment of solid waste reduction goals? <br />e. Would the project comply with federal, state, and local management and reduction statutes <br />and regulations related to solid waste? <br />Using solid waste generation rates from the General Plan EIR, the project would generate <br />approximately 262 pounds of solid waste per day. This is within the anticipated solid waste <br />generation in the General Plan EIR (approximately 180,000 pounds per day). Therefore, impacts <br />resulting from increased solid waste generation would be consistent with the conclusions provided <br />in the General Plan EIR. The project would have no impacts beyond those analyzed previously. <br />LESS THAN SIGNIFICANT OR LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED <br />Conclusion <br />Project impacts would not require new or altered utility facilities, consistent with the General Plan <br />EIR. The project would have no new or substantially more severe impacts, nor would there be any <br />potentially significant off-site impacts, cumulative impacts, or previously identified significant <br />effects not discussed in the General Plan EIR. Also, no previously identified significant effects were <br />determined to have a more severe adverse impact than those discussed in the General Plan EIR. <br />
The URL can be used to link to this page
Your browser does not support the video tag.