Laserfiche WebLink
Recommended Conditions of Approval October 21, 2019 <br />PLN17-0034 311 MacArthur Blvd. Page 7 of 12 <br />28. Encroachment Permit. Any work in the Public Right-of-Way shall require an <br />encroachment permit from the City of San Leandro Engineering and Transportation <br />Department. <br />29. Pedestrian Flashing Sign. The Applicant shall add a pedestrian rapid-flashing beacon <br />at the crosswalk on MacArthur Boulevard (near Broadmoor). The crosswalk warning <br />system to be installed by the applicant must be manufactured specifically for the purpose <br />of enhancing pedestrian safety, and must be classified as a Rectangular Rapid Flashing <br />Beacon (“RRFB”) in the U.S. Department of Transportation, Federal Highway <br />Administration, Manual on Uniform Traffic Control Devices (MUTCD), Interim <br />Approval 21 Memorandum, dated March 20, 2018. <br />Grading <br />30. Grading Permit. A Grading Permit will be necessary for the project. The requirements <br />for said permit are indicated in San Leandro Municipal Code §7-12. The permit will be <br />issued prior to or concurrent with the Building Permit. The San Leandro Municipal Code <br />can be found at http://www.sanleandro.org/about/municipal_code.asp. <br />31. Construction General Permit. The project is subject to a Construction General Permit <br />according to the National Pollutant Discharge Elimination System (NPDES) General <br />Permit No. CAS000002. The general permit is applicable to construction sites that <br />disturb one or more acres of land surface. The applicant will be required to register the <br />project with the State Water Board’s Storm water Multi-Application and Report <br />Tracking System (SMARTS) website. A Qualified SWPPP Developer (QSD) and a <br />Qualified SWPPP Practitioner (QSP) must be responsible for permit compliance. The <br />SMARTS system will generate a Waste Dischargers Identification (WDID) number <br />which must be printed on the grading and/or erosion control plans. <br />Impact Fees <br />Please note that this is an estimated amount using the Fiscal Year 2018-2019 fee rates. <br />These fees are subject to change at the start of each fiscal year and will not be vested until <br />issuance of building permit. The property is outside the MacArthur Boulevard <br />Underground Utility District. Therefore, no Underground Utility Fee is due for this <br />project. <br /> <br />32. Park Facilities. A Park Facilities Development Impact Fee shall be assessed assuming <br />20 dwelling units (du) as follows: <br /> Park Land Acquisition Fee: $14,126.00/du or $282,520.00 <br /> Park Improvement Fee: $2,279.00/du or $45,580.00 <br /> Total Park Impact Fee: $16,405.00/du or $328,100.00 <br />In lieu of the Park Land Acquisition Fee, the applicant can instead purchase and dedicate <br />(or partner with other developers to purchase and dedicate) 0.25 acres of park land <br />within the City limits. <br />33. Street Improvement. The Development Fee for Street Improvement (DFSI) shall be <br />assessed in the amount of $28,758.40 which is calculated at $1,437.92 per housing unit. <br />However, a credit for the existing use of the property is applied to this fee, in the amount