My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2019-171
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2019
>
Reso 2019-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 12:33:43 PM
Creation date
12/6/2019 12:32:56 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
10/21/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />311 MacArthur Boulevard Residential Project <br /> <br />44 <br />wastewater disposal systems would be installed. Therefore, the project would have no impacts <br />beyond those identified in the General Plan EIR. <br />LESS THAN SIGNIFICANT OR LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED <br />f. Would the project directly or indirectly destroy a unique paleontological resource or site or <br />unique geologic feature? <br />The General Plan EIR found less than significant impacts to paleontological resources, as the 2035 <br />General Plan requires archaeological site inventories and consultation in the event of discovery of <br />paleontological resources during construction and preconstruction activities on development sites. <br />2035 General Plan Policy CD-1.12 and Action CD-1.12A would apply to the project. If paleontological <br />resources are encountered, implementation of 2035 General Plan Policy CD-1.12, including action <br />items, would ensure impacts would be less than significant. Therefore, the project would not have <br />an impact beyond those previously identified in the General Plan EIR. <br />LESS THAN SIGNIFICANT OR LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED <br />Conclusion <br />As discussed in the General Plan EIR, implementation of 2035 General Plan policies would reduce <br />potential impacts to less than significant levels. The project would have no new or substantially <br />more severe impacts to geology and soil resources, nor would there be any potentially significant <br />off-site impacts, cumulative impacts, or previously identified significant effects not discussed in the <br />General Plan EIR. Also, no previously identified significant effects were determined to have a more <br />severe adverse impact than those discussed in the General Plan EIR.
The URL can be used to link to this page
Your browser does not support the video tag.