My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2019-171
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2019
>
Reso 2019-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 12:33:43 PM
Creation date
12/6/2019 12:32:56 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
10/21/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />311 MacArthur Boulevard Residential Project <br /> <br />50 <br />Strategy/Action Project Consistency <br />(a) Requiring construction and grading practices that <br />minimize airborne dust and particulate matter; <br />(b) Ensuring that best available control technology is <br />used for operations that could generate air pollutants; <br />(c) Encouraging energy conservation and low-polluting <br />energy sources; <br />(d) Promoting landscaping and tree planting to absorb <br />carbon monoxide and other pollutants; and <br />(e) Implementing the complementary strategies to <br />reduce greenhouse gases identified in the Climate Action <br />Plan. <br />Source: City of San Leandro 2009, 2016 <br />LESS THAN SIGNIFICANT OR LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED <br />Conclusion <br />Based on the GHG emissions analysis provided in the General Plan EIR and consideration of the <br />project relative to local GHG emissions thresholds described above, no specific impacts or peculiar <br />circumstances associated with the project would occur that would require additional review. The <br />project would comply with applicable GHG standards. The project would have no new or <br />substantially more severe impacts to GHGs, nor would there be any potentially significant off-site <br />impacts, cumulative impacts, or previously identified significant effects not discussed in the General <br />Plan EIR. No previously identified significant effects were which are determined to have a more <br />severe adverse impact than discussed in the General Plan EIR.
The URL can be used to link to this page
Your browser does not support the video tag.