My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2019-171
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2019
>
Reso 2019-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 12:33:43 PM
Creation date
12/6/2019 12:32:56 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
10/21/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B Recommended Findings of Fact October 21, 2019 <br />PLN17-0034 311 MacArthur Boulevard Page 4 of 6 <br />Per Institute of Transportation Engineers (ITE) trip generation manual, a 20-unit <br />townhome development would generate approximately 10 trips in the PM peak <br />hour and approximately 116 vehicle trips per day. The ITE trip general manual does <br />not include a specific land use category for social service uses, so the trip generation <br />rates for Recreational Community Center are applied in this case. The existing use <br />generates approximately 259 daily trips and 16 trips in the PM peak hour. <br />Therefore, the proposed project is anticipated to generate approximately 143 fewer <br />daily vehicle trips than the former use. <br /> <br />In addition, alternative travel modes are available and easily accessible from the <br />subject property. Several AC Transit bus stops are located on MacArthur Boulevard <br />directly in front of the proposed site (Routes 34, 35, and NX3), with routes that <br />extend from Hayward BART to San Francisco Salesforce Transit Center, as well <br />as a striped Class II bike lane in the southbound direction and a Class I shared bike <br />lane in the northbound direction. <br /> <br />There is adequate public service to the proposed development, including but not <br />limited to: the gas and electric company, the water district, waste disposal, cable <br />TV and police and fire department. <br />5. The Planned Development Project Plan will provide superior urban design in <br />comparison with the development under the base district zoning regulations. <br />Given the irregularly-shaped corner lot located at the nexus of a commercial <br />corridor and single-family district, the Planned Development provides a design plan <br />that allows for one congruous development on a site that contains two separate base <br />zoning districts, CC and RS. The townhome development with semi-private yards <br />and attached garage parking maximizes the concept of homeownership while <br />providing for sufficient open and landscaped areas for community spaces and on- <br />site storm water retention. Given its context along a major transit and bike arterial <br />and existing nonconforming setbacks along MacArthur Boulevard, the project <br />provides adequate parking and increased yards. <br />6. The Planned Development Project includes adequate provisions for utilities, <br />services, and emergency vehicle access; and that public service demands will not <br />exceed the capacity of the existing and planned systems. <br />There is adequate public service provided to the proposed subdivision, including <br />but not limited to the gas and electric, the water, waste disposal, cable TV, and <br />police and fire services. The Engineering and Transportation Department, and Fire <br />Department have found the access to the site to be safe for vehicular, pedestrian <br />and emergency vehicle access. <br />
The URL can be used to link to this page
Your browser does not support the video tag.