My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2019-177
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2019
>
Reso 2019-177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 12:36:34 PM
Creation date
12/6/2019 12:34:16 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
10/21/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Garland/DBS, Inc. x. <br />3800 East 91St Street <br />GARLAND <br />Cleveland, OH 44105 <br />Phone: (800) 762-8225I ------ D --- B S A Subsidiary of Garlan Industries-, <br />ax:(216)since '1 895 F883-2055 <br />ROOFING MATERIAL AND SERVICES PROPOSAL <br />City Hall Roof Restoration <br />City of San Leandro <br />835 E 14th St. <br />San Leandro, CA 94577 <br />Date Submitted: 08/16/2019 <br />Proposal #: 25 -CA -190682 <br />MICPA # 14-5903 <br />California General Contractor License #: 949380 <br />Purchase orders to be made out to: Garland/DBS, Inc. <br />Please Note: The following budget/estimate is being provided according to the pricing <br />established under the Master Intergovernmental Cooperative Purchasing Agreement (MICPA) <br />with Cobb County, GA and U.S. Communities. This budget/estimate should be viewed as the <br />maximum price an agency will be charged under the agreement. Garland/DBS, Inc. <br />administered a competitive bid process for the project with the hopes of providing a lower market <br />adjusted price whenever possible. <br />Scope of Work: <br />1. Inspect roof and cut out any blisters, mole runs, and damaged areas. Apply Green <br />Lock Membrane adhesive inside cut and apply new cap sheet membrane. <br />2. Remove and dispose of all base flashings, detail flashings, and coping metal. <br />3. Replace base all flashings with Flexbase 80 and StressPly E FR Mineral in Green -Lock <br />Flashing Adhesive. <br />4. Power wash roof system with simple green or tsp and water solution. Ensure the roof is <br />free of all dirt, debris, and contaminants. <br />5. Coat all base flashings with Pyramic Base and Pyramic. (1.5+ 1.5) <br />6. Apply Garla-Block primer at 1/2 gallon per square. <br />7. Apply White -Star at 2 gallons per square. Immediately embed 200 lbs of 3/8" gravel <br />meeting title 24 requirements. <br />8. Install new Pre -Formed ANSI-SPRI ES -1 Coping. <br />9. On metal roof towers build out metal flashing to remove internal gutter. <br />10. Replace expansion joint with new Expand -O -Flash expansion joint and cap with metal. <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.