My WebLink
|
Help
|
About
|
Sign Out
Home
8C Consent 2020 0203
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0203
>
8C Consent 2020 0203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 5:08:50 PM
Creation date
1/28/2020 5:08:45 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/3/2020
Retention
PERM
Document Relationships
Reso 2020-010
(Reference)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 20-001 <br />This project is categorically exempt from CEQA review per CEQA Guidelines section 15301(c). <br />The Notice of Exemption was filed with the Alameda County Recorder on March 3, 2019. <br />Summary of Public Outreach Efforts <br />·The Notice to Bidders was published in the Daily Review, the South County Post, Vision <br />Hispana and Sing Tao. <br />·Notices were issued to twenty-three builders’ exchanges and construction data firms as <br />well as a list of contractors that have asked to be notified of bidding opportunities via <br />email. <br />·The project was described on the Engineering and Transportation Department website. <br />·Prior to construction, staff notified residents residing on the streets included in the project <br />of the project schedule. The contractor also provided notifications to properties adjacent to <br />the work area via door hangers immediately before the work started. <br />Fiscal Impacts <br />The total project cost is $2,795,000, as follows: <br />Design and Bid: $55,000 <br />Construction Contract:$1,720,000 <br />Construction Management and Inspection:$120,000 <br />Sub-total: $1,895,000 <br />Curb Ramp Upgrade Work (Awarded Separately)$900,000 <br />Project Total $2,795,000 <br />Change Order Summary <br />Change Order limit authorized at contract Award: 15% (or $258,130) <br />CCO No. Description Amount % <br />1.0 Net increase in measured <br />quantities, for City $ 49,654 3% <br />added scope, partial revision <br />of seal treatments <br />due to re-evaluated field <br />conditions, and differences <br />between bid and installed <br />measured quantities <br />2.1 Partial area correction from <br />chip seal to slurry $ (105,279) -6% <br />seal <br />2.2 Post bid addition of class 4 <br />bike lanes on Alvarado $ 50,791 3% <br />Street <br />3.1 Additions and revisions <br />made to pavement striping $ 10,175 1% <br />Page 3 City of San Leandro Printed on 1/28/2020 <br />21
The URL can be used to link to this page
Your browser does not support the video tag.