Laserfiche WebLink
SAN LEANDRO SHORELINE DEVELOPMENT EIR ADDENDUM PROJECT <br />CITY OF SAN LEANDRO <br />LIST OF FIGURES <br />Figure 2-1 General Plan Re -designation ............... <br />Figure 2-2 Re -zoning .............................................. <br />Figure 2-3 Modified Project Conceptual Site Plan <br />LIST OF TABLES <br />Table 3-1 <br />San Leandro Shoreline Development Construction -Related Criteria Air Pollutant <br />emissions Estimates................................................................................................. <br />Table 3-2 <br />Construction Risk Summary..................................................................................... <br />Table 3-3 <br />Construction -Related Fuel Usage............................................................................ <br />Table 3-4: <br />Certified EIR Project Trip Generation....................................................................... <br />Table 3-5: <br />Modified Project Trip Generation............................................................................ <br />APPENDICES <br />Appendix A: Air Quality and Greenhouse Gas Analysis <br />Appendix B: Health Risk Assessment (HRA) <br />Appendix C: Energy Usage Analysis <br />Appendix D: San Leandro Shoreline Trip Generation Memorandum <br />Appendix E: Modified Water Demand Calculations <br />SOURCES <br />.9 <br />11 <br />16 <br />29 <br />32 <br />43 <br />79 <br />80 <br />In addition to the technical appendices, all documents cited in this report and used in its preparation are <br />hereby incorporated by reference into this report. Copies of documents referenced herein are available <br />for review at the City of San Leandro, 835 East 14th Street, San Leandro, CA 94577. <br />Page 2 PlaceWorks <br />