Laserfiche WebLink
SAN LEANDRO SHORELINE DEVELOPMENT EIR ADDENDUM PROJECT <br />CITY OF SAN LEANDRO <br />1. Introduction <br />1.1 BACKGROUND, PURPOSE, AND SCOPE <br />This document is an Addendum to the Environmental Impact Report (EIR) for the San Leandro Shoreline <br />Development Project (referred to as the "Original Project"), State Clearinghouse (SCH) No. 2013072011, <br />certified on July 15, 2015, which was completed for an integrated master planned development and a <br />public/private partnership between Cal Coast Companies LLC and the City of San Leandro, on <br />approximately 75 acres of the City -owned shoreline. <br />The Original Project analyzed in the Certified EIR indicated compliance with all Federal, State, and <br />Regional regulations of the time, as well as agency approval of the environmental analysis and impact <br />mitigation program. Components of the Project's original conceptual design were coordinated with 2015 <br />sea level planning requirements of the Bay Conservation and Development Commission (BCDC). At the <br />time of EIR Certification, BCDC required relevant projects to plan for mid-level sea level rise of <br />approximately 36 inches. However, BCDC now requires projects to plan for the upper range of sea level <br />rise, approximately 65 inches. In response, Cal Coast has proposed a series of modifications to the <br />conceptual design which are described in detail below in Section 2, Project Description. <br />This Addendum serves as the environmental review pursuant to the provisions of the California <br />Environmental Quality Act (CEQA), Public Resources Code Section 21000 et seq. and the State CEQA <br />Guidelines (California Code of Regulations, Title 14, Section 15000 etseq.) for proposed modifications to <br />the Original Project, which is referred to in this Addendum as the "Modified Project". <br />Pursuant to the provisions of CEQA and the State CEQA Guidelines, the City of San Leandro is the lead <br />agency because it has the principal responsibility for deciding whether or not to approve the proposed <br />project. This Addendum analyzes the changes to the Original Project, described in detail below in Section <br />2, Project Description. <br />1.2 ENVIRONMENTAL PROCEDURES <br />Pursuant to Section 21166 of CEQA and Section 15162 of the CEQA Guidelines, when an EIR has been <br />certified or a negative declaration adopted for a project, no subsequent EIR or negative declaration shall <br />be prepared for the project unless the lead agency determines, on the basis of substantial evidence in the <br />light of the whole record, that one or more of the following conditions are met: <br />January 2020 Page 3 <br />