Laserfiche WebLink
partitions, walls, rooms, windows, and common or shared entryways. <br />The plans shall identify all areas where commercial cannabis <br />activities will be conducted. Plans shall be prepared by a licensed <br />architect. <br />5) Existing and Proposed Elevations. Show, label, and dimension all <br />details for window types, trim, eaves, roof materials, exterior materials, <br />fencing, trash enclosures, mechanical equipment, and screening. Provide <br />color elevations of proposed building(s). For new construction, a color <br />and materials board and color renderings shall be required. <br />f) A Traffic Generation Report prepared and stamped by a licensed <br />transportation engineer. The report shall identify the estimated number of <br />trips generated by the proposed use and summarize existing conditions <br />on surrounding roadways. <br />g) A Noise Study or statement prepared by a qualified professional such as <br />an acoustical engineer. The study shall identify and analyze potential <br />sources of noise related to the proposed use and provide acoustically <br />feasible abatement measures as necessary. <br />h) An Odor Control Mitigation Plan or statement describing assumed <br />conditions and any necessary measures taken to monitor, control, and/or <br />mitigate odors that may be generated from the manufacturing process. <br />i) A digital copy of all required application exhibits shall be provided in <br />an accessible format. <br />§5.6.130: Incomplete Applications <br />Following City review of an application, if an applicant fails to submit any <br />required documentation within sixty (60) calendar days from the date of <br />written notification from the City, the application shall be deemed abandoned <br />and closed. No time extensions or exceptions shall be granted. <br />Resolution Exhibit A, Page 4 of 4 <br />