My WebLink
|
Help
|
About
|
Sign Out
Home
8C Consent 2020 0316
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0316
>
8C Consent 2020 0316
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 10:45:02 PM
Creation date
3/10/2020 10:44:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/16/2020
Retention
PERM
Document Relationships
Reso 2020-026
(Amended by)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: March 16, 2020 <br />Staff Report <br />Agenda Section:File Number:20-085 CONSENT CALENDAR <br />Agenda Number:8.C. <br />TO:City Council <br />FROM:Jeff Kay <br />City Manager <br />BY:Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW:Liz Warmerdam <br />Interim Finance Director <br />TITLE:Staff Report for a City of San Leandro City Council Resolution to Accept the <br />Work of the Annual Street Overlay/Rehabilitation 2016-17 Phase 2, Project No. <br />2017.0050 <br />SUMMARY AND RECOMMENDATIONS <br />This contract reconstructed eight (8) street segments throughout the City, including upgrades to <br />several curb ramps to comply with Americans with Disabilities Act (ADA) requirements. <br />Staff recommends the following actions: <br />·Accept the work; <br />·File the Notice of Completion; and <br />·Authorize the City Manager to release the performance and payment bonds, and to <br />release the maintenance bonds for the subject project upon successful completion of the <br />one-year maintenance period. <br />BACKGROUND <br />This contract is the second contract funded by the subject project. The project was split into two <br />phases in order to advance the construction and use available grant funds expeditiously while <br />design work was still progressing. The first contract for repairs and reconstruction/overlay on a <br />total of 4.2 lane miles of pavement has already been completed and accepted by the Council. <br />This second phase contract completed repairs, reconstruction and/or overlay on a total of 2.7 lane <br />miles of pavement on eight segments of City streets, including upgrading 32 curb ramps within <br />the project limits to comply with the ADA. In addition to reconstruction of streets, the project <br />constructed two enhanced crosswalks with Rectangular Rapid Flashing Beacons on San Leandro <br />Boulevard to support our complete streets goals and installed eleven speed cushions on several <br />streets for neighborhood traffic calming. A list of work locations included in this contract is <br />attached to this staff report. <br />Page 1 City of San Leandro Printed on 3/11/2020 <br />210
The URL can be used to link to this page
Your browser does not support the video tag.