Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SERVICES <br />PROJECT BACKGROUND <br />The City of San Leandro annually allocates funds toward street maintenance and rehabilitation, The total <br />budget for the Annual Street Overlay/Rehabilitation 2019-21 Project, including design, construction, <br />inspection, construction management, and contingency is $11,400,000. This project will involve extensive <br />paving work on street sections comprising of 2 arterial streets, 2 collector streets, and 10 residential streets. <br />Street sections included in the project are listed as follows: <br />Arterial and Collector Streets <br />Street Name <br />Start Location <br />End Location <br />Manor Boulevard <br />Kesterson St <br />Farnsworth Boulevard <br />Grand Avenue <br />Joaquin Avenue <br />Sybil Avenue <br />Hes erian Boulevard <br />Thornally Drive <br />CV Freeway <br />Bancroft Avenue <br />Lee Avenue <br />S bil Avenue <br />Residential Streets <br />Street Name <br />Start Location <br />End Location <br />Corbet Court <br />Thornally Drive <br />North End Cul De Sac <br />Olive Court <br />Hes erian Boulevard <br />East End Cul De Sac <br />Norene Way <br />Benedict Drive <br />Sandelin Avenue <br />Fordham Avenue <br />Corvallis St <br />Rollins St <br />Rollins St <br />Ottawa Avenue <br />Fordham Avenue <br />Pleasant Way <br />Stoakes Avenue <br />Bellview Drive <br />Fleming St <br />Faro Avenue <br />Manor Boulevard <br />West Avenue 130th <br />Neptune Drive <br />Aurora Drive <br />Marina Court <br />West Avenue 130th <br />South End Cul De Sac <br />Thornally Drive <br />Hes erian Boulevard <br />Central Avenue <br />The streets were selected based on their Pavement Condition Index rating, and by visual inspection of road <br />surface deficiencies. <br />Along with pavement construction, the project will address ADA accessibility along the selected street <br />segments and new curb ramps and crossings shall be constructed where required, ADA compliant curb <br />ramps and street crossings shall be designed at all corners of a four-way intersection, and at two crossings <br />of a °T" intersection. <br />This contract is for consulting services to develop Plans, Specifications, and Engineer's Estimate for the <br />Annual Street Overlay/Rehabilitation 2019-21 Project as described below. In addition, this CSA shall <br />Consulting Services Agreement between City of San Leandro and Nichols Consulting Engineers <br />for Annual Street Overlay/Rehabilitation 2019-21, Project No. 2020.0050 Exhibit A —Page 1 of 10 <br />