My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-031
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:44:08 PM
Creation date
4/13/2020 1:11:55 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
4/6/2020
Retention
PERM
Document Relationships
8F Consent 2020 0406
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0406
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to keep utility providers informed about the project and schedule to allow for proper notification and <br />planning should utility providers have planned maintenance projects within the subject street sections <br />and/or need to lower/adjust their utilities to accommodate street rehabilitation and particularly <br />reconstruction. One of the first and earliest items that consultant will complete is to send notification letters <br />to applicable utility providers with a preliminary project schedule for street rehabilitation and reconstruction. <br />Consultant will also request utility as-builts and record drawings for street sections planned for <br />reconstruction. As part of consultant's field investigations, as an optional task, consultant will locate utilities <br />using GPR and coordinate with and provide this information to applicable utility providers. This GPR data is <br />for initial planning purposes with utilities. <br />Consultant will also carefully document all utility coordination notifications, conversations, meetings and <br />information in a dated matrix format with mailing details. Follow-up calls will be made for each of the above <br />notifications to confirm receipt. Consultant will keep City informed of any project delays related to utilities. <br />Deliverables: Utility Notification Letters and Utility Contact Matrix. <br />1 C) Caltrans and Railroad Permitting (Optional Task): <br />At the kick-off meeting, consultant will discuss further the City's plans to extend rehabilitation and street <br />improvements on Hesperian Boulevard into Caltrans ROW at Highway 238 and the railroad north of <br />Springlake Dr. If the currently scoped roadway maintenance improvements are to extend into or impact <br />Caltrans or Railroad ROW, consultant will setup a meeting with each of these stakeholders to confirm <br />encroachment permit, or similar, requirements. Consultant will prepare the necessary encroachment permit <br />application, on behalf of the City, for Caltrans review for the work at Hesperian Blvd and assume one <br />resubmittal is necessary to address any comments from Caltrans. Consultant will utilize its railroad <br />specialist, JMA Civil, to coordinate with the railroad owner on right -of -entry, preliminary engineering letter <br />with UPRR, site visit, and CPUC Form G preparation and filing. Any additional work necessary to complete <br />the coordination and permitting beyond what is stated above may be prepared for additional scope and fee. <br />Deliverables: Caltrans Encroachment Permit Application and Railroad Right -of -Entry Forms for Filing. <br />Task 2 — Pavement Rehabilitation Design <br />2A) Pavement and Curb & Gutter Condition Survey: <br />Consultant will perform a detailed pavement condition survey of each street section based on distresses <br />concurrent with the deflection testing. The surveys will generally cover the travel and parking lanes. <br />Pavement condition surveys serve the purpose of further refining the appropriate pavement rehabilitation <br />treatments that are developed based on pavement deflection testing and coring. <br />This condition survey will generally note the presence of load related and environmental distresses, such <br />as alligator cracking, longitudinal and transverse cracking, rutting, patches and utility cuts, distortions and <br />depressions as they pertain to developing appropriate pavement treatments. In addition, potential base <br />repairs will be identified in the condition survey. Base repairs will be measured in length and width to <br />estimate base repair bid quantities and located on design sheets for all street sections. It is the intent that <br />base repair quantities will be for bidding quantity purposes only, and that actual locations will be marked by <br />Consultant with City's construction manager prior to construction. <br />A visual survey of all curb and gutters will be included to identify areas where drainage or the adjacent <br />pavement has been compromised. Consultant's scope is limited to repair recommendations for sections of <br />Consulting Services Agreement between City of San Leandro and Nichols Consulting Engineers <br />for Annual Street Overlay/Rehabilitation 2019-21, Project No. 2020.0050 Exhibit A — Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.