My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-031
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:44:08 PM
Creation date
4/13/2020 1:11:55 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
4/6/2020
Retention
PERM
Document Relationships
8F Consent 2020 0406
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0406
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3 — Plans, Specifications & Estimates (PS&E) <br />The work that will be performed during the development of design PS&E are outlined in the subsequent <br />tasks. <br />3A) Design Data Gathering: <br />Consultant will review relevant available data and records from the City, public and private utility providers, <br />and other sources that may be appropriate to support the preparation of project contract documents. These <br />may include but are not limited to the City drainage structure inventory maps, aerial photographs of the <br />City, as -built street improvement and infrastructure plans, striping and markings, as -built plans from utility <br />providers, including any preliminary plans for future work that may conflict with this project. The gathered <br />information will be compiled and included in the topographic surveys used for design. <br />Consultant has assumed that the City will be able to provide the following: <br />1. Any information readily available regarding utilities (i.e., water, sanitary sewer, electrical, and storm <br />drain), boundary and property limits (if available), tree locations, site features and existing <br />construction as is available from City. <br />2. Readily available aerial maps. <br />3. As -built drawings for existing lighted pedestrian crossing facilities (i.e. wiring, structures) on the <br />overlay program street list and the 2020 Pedestrian Crossing Improvements. <br />4. Indicate any other planned improvements adjacent to the 2020 Pedestrian Crossing Improvements. <br />3B) Topographic Survey and Preliminary Design: <br />Consultant will complete monument/control recovery, field investigation and field surveys sufficient to <br />prepare a topographic mapping product for all streets in the project. The mapping shall be compiled at an <br />agreed upon scale with a 1' contour interval and will be based on the City Datum. <br />The mapping area shall be a corridor along each of the street sections between the existing back of walk to <br />opposite back of walk, starting and stopping at the designated locations and including through the returns <br />of the terminating streets. In the absence of an existing sidewalk, the survey will extend to 5 feet behind the <br />curb or edge of pavement, or up to the first substantial barrier (wall, fence, etc.), whichever occurs first. <br />Lastly, the mapping will extend 25 feet beyond the curb return up each intersecting side street. <br />The topographic data to be collected for the Annual Overlay/Rehabilitation street list is more specifically <br />defined as: <br />• Cross-sections at 50' intervals along with detailed surface topography and/or additional spot <br />elevations as required defining the longitudinal and cross slope grade breaks. Typically the cross <br />section will include back of walk, top of curb, flowline and lip of gutter, pavement'/4 point (if one <br />exists), and pavement centerline. <br />• Surveyed locations for significant surface features, such as curbs, gutters, sidewalks, driveways, <br />misc. concrete, pavement, striping, fences, surface utilities, trees, signs, street lights and signals <br />will be included. A structure inventory for sanitary and storm drain facilities reflecting rim elevations, <br />invert elevations, pipe direction and pipe size will be provided for accessible structures within the <br />mapping limit. To the extent visible, consultant will obtain a measurement from the top of manhole <br />rim to the top of cone, and note any adjustment rings. Consultant shall not enter a manhole to <br />obtain any data. <br />Consulting Services Agreement between City of San Leandro and Nichols Consulting Engineers <br />for Annual Street Overlay/Rehabilitation 2019-21, Project No. 2020.0050 Exhibit A — Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.