My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-031
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:44:08 PM
Creation date
4/13/2020 1:11:55 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
4/6/2020
Retention
PERM
Document Relationships
8F Consent 2020 0406
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0406
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
striping to indicate the difference between proposed and existing. Existing striping will be shown outside of <br />the paving limits up to 25 feet into begin, end and cross streets. <br />Traffic control plans are not included in this scope of work. The City desires to have the contractor prepare <br />traffic control plans in accordance with project technical specifications and requirements and submit to the <br />City's traffic engineering group for review. <br />Technical specifications for traffic control will be further refined to add additional language regarding early <br />submittal of traffic control plans by the contractor and that plans are street specific. The City's traffic <br />engineering group will edit and provide comments to meet their requirements. <br />It is assumed that all non-compliant curb ramps will be replaced or retrofitted (e.g., detectable warning <br />surface embedded in concrete) in accordance with Greenbook or City based standards. Curb ramps will be <br />replaced or retrofitted based on guidance from the Department of Justice/Department of Transportation <br />Joint Technical Assistance on the Title II of the Americans with Disabilities Act Requirements to Provide <br />Curb Ramps when Streets, Roads, or Highways are altered through Resurfacing dated July 8, 2013. <br />Curb ramps will be identified as either Caltrans standard case or custom on the plans. Custom ramps will <br />be detailed in the construction drawings. Ramps that can be replaced using a Caltrans or City standard <br />case layout will not be included as a detail in the construction drawings. <br />A topographic survey has been proposed for all curb ramps identified for replacement. <br />The project will, to the extent possible and within the context of proposed rehabilitation, address visible <br />drainage issues. No major drainage improvements are assumed for this project which require significant <br />stormwater drain and pipe alteration and/or reconstruction. Green infrastructure design improvements are <br />not included in this scope of work but can be added for additional scope and fee, as needed. <br />Drainage improvements are expected for the two intersections (Aurora Drive at Walnut Drive and Monterey <br />Blvd at Anza Way) where bulb outs are to be installed. The drainage improvements are expected to be <br />limited to a trench drain and minor relocation of a drain inlet. <br />The 70% PS&E will include the City's 2020 Pedestrian Crossing Improvements RFP which includes new <br />RRFB systems, bulb outs, crosswalk improvements, and signage improvements for three intersections <br />(Aurora Drive at Walnut Drive, Williams Street at Joyce Street, and Monterey Blvd at Anza Way). <br />Consultant will prepare the Technical Specifications in MS Word format and will follow the City's formatting <br />conventions. The Technical Specifications and details will reference the City's standard provisions and <br />Greenbook Standards (including subsequent updates). Consultant will, however, recommend deviating <br />from Greenbook Standards where necessary, if such changes will improve the likelihood of achieving a <br />successful construction project without compromising the integrity of the design. <br />Consultant will prepare Engineer's Cost Estimate in MS Excel format based on the most recent <br />construction cost data available to consultant. This estimate will be updated and refined as the design effort <br />progresses. <br />It is assumed that the City will require a 15 -day review/comment period once the 70% PS&E package is <br />submitted. <br />Deliverables: Six (6) copies of 70% PS&E with full size plan sets. <br />Consulting Services Agreement between City of San Leandro and Nichols Consulting Engineers <br />for Annual Street Overlay/Rehabilitation 2019-21, Project No. 2020.0050 Exhibit A — Page 9 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.