My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-035
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 12:34:14 PM
Creation date
4/28/2020 12:19:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
4/20/2020
Retention
PERM
Document Relationships
8C Consent 2020 0420
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />SCOPE OF <br />SERVICES <br />LEE & RO will provide engineering services for the Secondary Effluent (SE) Line <br />Replacement Project and Davis Street Manhole Replacement project. The project includes <br />the following elements: <br />1. Install CIPP liner in the existing 36" Secondary Effluent (SE) pipeline between the SE wet <br />well at Secondary Clarifier No. 1 and the Effluent Pump Station at the City's Water <br />Pollution Control Plant (WPCP). <br />2. Install elbows on the existing 30" and 33" Sanitary Sewer (SS) pipes and install new manholes <br />in close vicinity of the new elbows in Davis Street (in front of the Headworks) to connect the <br />30" SS and 33" SS to the Headworks at the City's Water Pollution Control Plant (WPCP). <br />3. Conduct CCTV inspection of the 30" and 33" SS pipes between the intersection of Davis <br />Street and Doolittle Drive and the influent junction box in Davis Street in front of the <br />abandoned Headworks. <br />LEE & RO will perform the following tasks for the above listed project elements. <br />Task 0: Project Management and Workshops: LEE & RO shall provide project <br />management and administration for proper planning, filing, execution, monitoring, quality <br />control, and reporting of this project. LEE & RO shall also prepare a brief monthly progress <br />summary letter report for attachment to the monthly invoice to track status of budget <br />expenditures (including showing percent completion for each task) and key work activities <br />completed during that billing period. LEE & RO shall prepare for and attend up to four <br />workshops to review the project progress and design submittals. <br />Meetings and Workshops: <br />• Progress meetings/ submittal review workshops (up to 4 meetings) <br />Consulting Services Agreement between City of San Leandro and Last revised 02/28/2020 <br />Lee & Ro for SE Line Replacement and Davis St. Manhole Replacement Exhibit A — Page 1 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.