from the contractor for the changes made during construction <br />Assumations: <br />• Separate bid packages will be prepared for the SE pipeline project and 30"/33"SS <br />pipeline project <br />• Improvements to the 30" and 33" SS pipes between the intersection of Davis Street and <br />Doolittle Drive and the influent junction box in Davis Street in front of the abandoned <br />Headworks is not included in scope, only CCTV of this pipe segment is included. <br />• City will prepare front-end specifications in Greenbook format <br />• No electrical and Instrumentation drawings will be needed <br />• City will provide all utility, environmental, and permit coordination <br />Schedule: <br />• Draft Predesign Report 3 months from NTP <br />• Final Predesign Report 3 weeks from receiving City's comments on Draft Predesign <br />Report <br />• 65% Submittal due 3 months from receiving City's comments on DraftPredesign <br />Report <br />• 90% Submittal due 2 months from receiving City's comments on 65% Submittal <br />• 100% Submittal due 1 month from receiving City's comments on 90% Submittal <br />• Bid set due 2 weeks from receiving City's comments on 100% Submittal <br />Consulting Services Agreement between City of San Leandro and Last revised 02/28/2020 <br />Lee & Ro for SE Line Replacement and Davis St. Manhole Replacement Exhibit A — Page 8 of 8 <br />