My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-035
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 12:34:14 PM
Creation date
4/28/2020 12:19:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
4/20/2020
Retention
PERM
Document Relationships
8C Consent 2020 0420
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
submittal/resubmittal), responding to 16 RFIs (4 hours per RFI), and preparing 2 design <br />clarification memos (8 hours per design clarification memo). <br />Meetings and Workshops: <br />• Construction progress meetings (as requested) <br />LEE & RO Deliverables: <br />• Review comments on submittals and resubmittals <br />• Response to RFIs <br />• Design Clarification Memos <br />Information Provided by City: <br />• Construction management and inspections <br />Task 7: Conformed Drawings: LEE & RO shall prepare conformed documents by <br />incorporating the changes that were made to the plans and specifications via addendum during <br />the bid periods. An allowance of 50 hours has been included for this task. The actual level of <br />effort could be higher or lower depending on the number of changes that were made to the <br />contract documents during bid periods. <br />LEE & RO Deliverables: <br />• Conformed Plans and Specifications (pdf) <br />Task 8: Record Drawings: LEE & RO shall prepare record drawings by incorporating the <br />changes that were made to the drawings during the construction. An allowance of 50 hours <br />has been included for this task. The actual effort could be higher or lower depending on the <br />number of changes that were made to the drawings during construction. Changes will not be <br />field verified, only redline markups from the contractor will be incorporated into the <br />drawings. <br />LEE & RO Deliverables: <br />• Record drawings (pdf and AutoCAD files) Information Provided by City: Redline markups <br />Consulting Services Agreement between City of San Leandro and Last revised 02/28/2020 <br />Lee & Ro for SE Line Replacement and Davis St. Manhole Replacement Exhibit A — Page 7 of 8 <br />