Laserfiche WebLink
DescriptionCurrent FeeReferenceProposed FeeExplanationCOMMUNITY DEVELOPMENT DEPARTMENT ‐ Building Regulations Division (continued)vii) Residential Seismic Retrofit projects using "Plan set A" (for one and two family residences) $75 plus Filing and Issuance Fee and other miscellaneous feesviii) Photovoltaic Systemsa) Residentiali) Up to 15kW$287    ii) each additional kW over 15kW $15b) Commerciali) Up to 25kW$400ii) 26kW ‐ 50kW$600iii) each additional kW (51kW ‐ 250kW)  $7iv) each additional kW over 250kW $5Note: For photovoltaic systems, total permit fees, including applicable Permit Issuance and Filing Fees, Automation Fees, Community Planning Fees, and other mandated fees shall not exceed amounts authorized via Government Code Section 66015.ix) SignsSign permit fees are based on all signs being on the same property and on the same permit.a) 1st Non‐energized sign attached to building.$107    b) each additional sign thereafter:$54    c) Pylon sign, energized or not, each:$226    d) Monument sign, energized or not, each$169    e) Relocation or alteration of any sign electronically or mechanically, but not including replacement of tubing, transformers and such parts subject to failure; or shop inspection by the local inspection department in lieu of a UL label (a local electrical inspection department label of approval shall be required), each$85    x) Demolitiona) Commercial/Residential Demolition up to 3,000SF$287    b) Each Additional 10,000SF$191    C. Plan Checking FeePlan checking fee shall be paid at the time of application for a building permit.  The plan checking fee is in addition to the building permit fee and shall be as follows:i) Plan Check Fee, if applicable80% of building permit feeii) For Master Plans (i.e. identical buildings built by the same builder on the same lot or in the same tract and for which building permits are issued at the same time)A full plan checking fee shall be paid for each Master Plan when more than one building will be built and one‐third (33%) of the full plan checking fee shall be paid for each production phase building at time of application.iii) Changes, revisions, or additions to plans previously checked$191 per hour; 1 hour minimum charge    iv) Additional plan review after the first re‐check$191 per hour; 1 hour minimum charge    v) Alternate Methods and Materials$191 per hour; 1 hour minimum charge    vi) Energy Conservation ‐ for all buildings and projects subject to the California Energy Commission’s conservation regulations20% of building permit feeD. Miscellaneous Feesi) Miscellaneous Inspectionsa) Fees for inspection not otherwise set forth herein$191 per hour; 1 hour minimum charge     b) Fees for inspection conducted outside of normal business hours$286 hourly rate; 2 hour minimum chargeii) Investigation Feesa) Investigation fee for work commenced without first obtaining permits as required by the San Leandro Municipal Code, whether or not a permit is subsequently issued   b) Investigation fee for conditions that are not in compliance with the San Leandro Zoning and/or Municipal Codes$191 per hour; 1 hour minimum charge     Note: Payment of any investigation fees does not exempt any person from compliance with all other provisions of applicable codes in the execution of the work nor from any other penalties prescribed by law. (1)(2)NEW DESCRIPTIONCommunity Planning Fee will not be charged for the following project types: permits for accessory dwelling units; stand‐alone mechanical, plumbing, and electrical permits; minor residential remodels, and; minor tenant improvements.Note: For small tenant improvements to existing buildings and ADUs, the Chief Building Official and/or the Community Development Director may waive the Community Planning Fee at his/her discretion.19