My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2020 0518
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0516
>
5A Public Hearings 2020 0518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 7:26:57 PM
Creation date
5/13/2020 7:26:45 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/18/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
DescriptionCurrent FeeReferenceProposed FeeExplanationCOMMUNITY DEVELOPMENT DEPARTMENT ‐ Building Regulations Division (continued)E. Other Fees and Charges (i) Technology Fee6% of permit fee, minimum $6.65 per permit type (ii) Community Planning Fee (for commercial, industrial & residential projects)0.3% of total valuation of construction (iii) Strong Motion Impact Fee: State mandated tax for the Seismic Safety Commission for seismic monitoring. ‐‐ Residential0.00013 per $1.00 Valuation or fraction thereof with a $0.50 min. ‐‐ Commercial/Industrial0.00028 per $1.00 Valuation or fraction thereof with a $.50 min. (iv) Building Standards Commission (SB1473) Fee: State Mandated tax for Green Building Standards collected for the State by the City.All Residential, Commercial, and Industrial permits that use Valuation to determine permit fees: $1.00 per $25,000 valuation or fraction thereof with a $1.00 minium. (v) Exception to Noise Ordinance$448 (vi) Certificate of Occupancy$191 per hour; 1 hour minimum charge (vii) Temporary Certificate of Occupancy per 30 days $191 per hour; 1 hour minimum charge (viii) Certificate of Compliance: $191 per hour; 1 hour minimum charge (ix) House Moving Permit$191 per hour; 1 hour minimum charge (x) Microfilm Copies$1.20 (xi) Photocopies$0.10 per page (xii) Microfilming of Permit and Plans includes imaging fee for fire permits: (For purposes of fee charges,each permit is considered a drawing) ‐‐ 8‐1/2 x 11 or 11 x 14 drawings including fire permits $1.90 per sheet ‐‐ All other size drawings$2.10 per sheet (xiii) AppealsDirect Costs (1) (1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs(2)NEW DESCRIPTIONCOMMUNITY DEVELOPMENT DEPARTMENT ‐ Code Enforcement Division1 Administrative CitationsMunicipal Code Violation ‐ 1st Violation$150 ‐ 2nd Violation$300 ‐ 3rd Violation$6002 Re‐Inspection Fee$191COMMUNITY DEVELOPMENT DEPARTMENT – Economic Development1 Development Agreements and Leases for City/Agency Owned Property2 Marina Leases(1) Direct Costs: Hourly personnel charge plus a factor of 33% for benefits, 14.80% for indirect overhead charges and 52.23% for staff support charges(2) Direct Costs/Planning: Hourly personnel charge plus a factor of 33% for benefits, 83% for indirect overhead charges and 89% for staff support charges(3) Based on case‐by‐case financial analysis and appraisals of subject facilities/improvements.Direct Costs (1) (2) plus the value of the extension/assignment (3)Direct Costs (1)Community Planning Fee will not be charged for the following project types: permits for accessory dwelling units; stand‐alone mechanical, plumbing, and electrical permits; minor residential remodels, and; minor tenant improvements.20
The URL can be used to link to this page
Your browser does not support the video tag.