My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2020 0615
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0615
>
8E Consent 2020 0615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:38:10 PM
Creation date
6/10/2020 2:38:06 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/15/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
BID SUMMARY BID OPENINGVillalobos & AssociatesFBD Vanguard Construction, Inc. Spencon Construction, Inc.DATE: Wednesday, May 6, 2020Date Approved: 4885 Bucknall Road550 Greenville RoadP.O. Box 1220TIME: 2:00 p.m.Prepared by: J. O'Driscoll San Jose, CA 95130Livermore, CA 94550Danville, CA 94526LOCATION: City Clerk's OfficePhone: (408) 585-5738Phone: (925) 245-1300Phone: (925) 984-2581Fax: N/AFax: (925) 245-1007Fax: (925) 984-2583ITEMNO.ITEMUNIT COST ITEM COST UNIT COSTUNIT COSTUNIT COSTCurb Ramp Upgrade PhaseThis document is a summary of bids received for the subject project and are provided only as a convenience. Listing of a particular bid is not a finding that such bid has been found to be responsive or accepted as complete by the City. An award of contract, if any, is subject to approval of the City Council and/or the City Manager. Contractors should refer to the contract documents for bidding information. PROJECT TITLE:PROJECT NO.:BID NO.:QUANTITYAnnual Street Sealing 2019-202020.007019-20.012ITEM COSTITEM COSTENGINEER'S ESTIMATEITEM COST14 Relocate Existing Type 1-B Pole with Pedestrian Head & Push Button per Section 701-101 EA$3,500.00 $3,500.00 $5,500.00 $5,500.00 $7,268.00 $7,268.00 $7,200.00 $7,200.0015 Install Pull box per Section 701-11 1 EA$2,500.00 $2,500.00 $500.00 $500.00$277.00 $277.00 $300.00 $300.0016 Install Conduit per Section 701-12 8 LF$150.00 $1,200.00 $250.00 $2,000.00$333.00 $2,664.00 $350.00 $2,800.00TOTAL BASE BID:**REQUIRED DOCUMENTATION:Agreement to be BoundSUBCONTRACTORS:CemexCentral ConcreteColumbia ElectricSECURITIES:Date:5/8/2020John O'Driscoll, Project ManagerDate:5/8/2020Nick Thom, City EngineerNOTES:*** Adjusted bid calculation based on Local Business Preference** Math Error CorrectedtbdNO NOYES YESYES YESYES YESNO NO$320,770.0010% Bid BondMercozaYESNONOtbdYESYESBid BondSan Leandro Local BusinessAddendum #1 - 5Reviewed by:Reviewed by:Columbia Electric, Inc. TPRC-Traffic Solutions10% Bid Bond$339,588.00 $371,660.0010% Bid Bond25 % ParticipationGood Faith Effort tbd$437,310.00Bid Summary - Annual Street Sealing 19-20, Curb Ramp Upgrade PhasePage 2 of 6Printed 5/8/2020 @ 3:02 PM518
The URL can be used to link to this page
Your browser does not support the video tag.