BID SUMMARY BID OPENINGDATE: Wednesday, May 6, 2020Date Approved: TIME: 2:00 p.m.Prepared by: J. O'DriscollLOCATION: City Clerk's OfficeITEMNO.ITEM UNIT COST ITEM COST1 Mobilization, Staging & Stockpiling per Sections 7-8.4 & 9-341 LS$40,000.00 $40,000.002 Temporary Traffic Control per Section 6001 LS$40,000.00 $40,000.003 Install Curb and Gutter per City Standard Plan No. 1001,080 LF$80.00 $86,400.004 Install Wheelchair Curb Cut Ramp per City Standard Plan Nos. 106A and 106B4,150 SF$33.00 $136,950.005 Install Sidewalk per City Standard Plan No. 1001,820 SF$24.00 $43,680.006 Install Concrete Apron per City Standard Plan No. 114280 SF$38.00 $10,640.007 Install Concrete Valley Gutter per City Standard Plan No. 114300 SF$49.00 $14,700.008 Install Asphalt Concrete Tie-ins per City Standard Plan Nos. 100 & 114995 CF$42.00 $41,790.009 Install Wet Set Truncated Dome Panel per City Standard Plan No. 106D2 EA$2,000.00 $4,000.0010 Adjust Utility Box to Grade per Section 301-1.64 EA$500.00 $2,000.0011 Relocate Roadside Sign and Post per Section 3152 EA$550.00 $1,100.0012 Relocate Roadside Sign on New Post per Section 3159 EA$650.00 $5,850.0013 Paint Curb Red per Section 314-4 1 LF$3,000.00 $3,000.00Curb Ramp Upgrade PhasePROJECT TITLE:PROJECT NO.:BID NO.:QUANTITYAnnual Street Sealing 2019-202020.007019-20.012ENGINEER'S ESTIMATESilMan IndustriesRosas Brothers Construction1600 Factor Avenue4731 Coliseum WaySan Leandro, CA 94577Oakland, CA 94601Phone: (510) 347-4800Phone: (510) 534-1077Fax: (510) 347-4801Fax: (510) 534-5077UNIT COSTUNIT COST$10,000.00 $10,000.00 $3,000.00 $3,000.00$10,000.00 $10,000.00 $7,000.00 $7,000.00$85.00 $91,800.00$85.00 $91,800.00$38.00 $157,700.00$37.00 $153,550.00$25.00 $45,500.00$28.00 $50,960.00$35.00 $9,800.00$43.00 $12,040.00$60.00 $18,000.00$50.00 $15,000.00$50.00 $49,750.00$30.00 $29,850.00$1,200.00 $2,400.00 $2,500.00 $5,000.00$550.00 $2,200.00$300.00 $1,200.00$800.00 $1,600.00$400.00 $800.00$750.00 $6,750.00$600.00 $5,400.00$2,500.00 $2,500.00 $5,000.00 $5,000.00ITEM COSTITEM COSTBid Summary - Annual Street Sealing 19-20, Curb Ramp Upgrade PhasePage 3 of 6Printed 5/8/2020 @ 3:02 PM519