My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2020 0706
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0706
>
8E Consent 2020 0706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 10:43:30 AM
Creation date
6/30/2020 10:55:07 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/6/2020
Retention
PERM
Document Relationships
Reso 2020-085 Contract De Silva Gates Street Overlay and Rehab
(Approved)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Download electronic document
View images
View plain text
File Number: 20-204 <br />bidder was advised of the agreement in writing and verbally at the mandatory pre- bid meetings. <br />Each contractor was given contact information for the Bay Area Business Roundtable, an <br />organization hired by the City to provide free technical assistance to comply with the CWA. All of <br />the bidders signed the Community Workforce Agreement commitment form. <br />As is standard in the construction industry, staff balanced site investigation costs with the risk of <br />finding unforeseen conditions during construction as well as the design costs with the level of <br />detail on the plans. As a result, unforeseen conditions may be encountered during construction <br />and plan details may need to be adjusted or clarified. In order to minimize delay to the project, <br />ensure that the scope of work is adjusted as needed to provide the highest quality project and to <br />take advantage of the favorable cost of the work along with providing for the expedient use of <br />grant funding, staff requests that the City Council authorize the City Manager or his designee to <br />negotiate and approve individual change orders up to 5% ($393,846) of the original contract <br />amount and cumulative change orders up to 25% ($1,969,231) of the original contract amount. <br />This will ensure efficient completion of the project on budget and on schedule. <br />Current Agency Policies <br />·Maintain and enhance San Leandro’s infrastructure. <br />Applicable General Plan Policies <br />·Policy CSF-6.8 Maintenance: <br />Ensure that sufficient funding is provided for the ongoing maintenance of City-owned <br />facilities, including streets, streetlights, traffic signals, landscaping, street trees, storm <br />drains, public buildings, and other infrastructure. <br />·Transportation Goal T-5: <br />Improve major transportation arteries for circulation in and around the city. <br />Permits and/or Variances Granted <br />·Caltrans encroachment permits have been obtained for work on Oakes Boulevard and E <br />14th Street as well as Washington Ave. <br />·Union Pacific Railroad encroachment permit will be obtained for work on Halcyon Drive. <br />Environmental Review <br />This project is categorically exempt from the California Environmental Quality Act (CEQA) per <br />Section 15301(c) of the CEQA guidelines. The Notice of Exemption was filed with the Alameda <br />County Recorder on September 27, 2019. <br />Summary of Public Outreach Efforts <br />The streets to be repaved are posted on the City’s website. Properties adjacent to the work will <br />receive a notification from the City and a second notification from the Contractor prior to the work. <br />Page 3 City of San Leandro Printed on 7/1/2020 <br />75
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).