My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2020 0706
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0706
>
8E Consent 2020 0706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 10:43:30 AM
Creation date
6/30/2020 10:55:07 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/6/2020
Retention
PERM
Document Relationships
Reso 2020-085 Contract De Silva Gates Street Overlay and Rehab
(Approved)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 20-204 <br />The Notice to Bidders was published in the East Bay Times, the South County Post, Visión <br />Hispana, and World Journal. Staff also notified nineteen builders’ exchanges and construction <br />data firms, as well as a list of contractors that asked to be notified of bidding opportunities via <br />email. <br />Fiscal Impacts <br />The estimated project cost is as described below: <br />Design and Bid $ 960,000 <br />Work done by Construction Contract 17-18 $325,000 <br />Construction Contract 18-20 $7,876,926 <br />Construction Management and Inspection $250,000 <br />Construction Contingency (25%)$1,969,231 <br />Total $11,381,157 <br />Budget Authority <br />This street rehabilitation project will be funded as follows: <br />Account No. Reso. Appropriation Dates & Source Amount <br />144-38-401-5240 FY 2018-19 Budget, Measure B*$1,060,000 <br />141-39-401-5240 FY 2018-19 Budget, Measure B and BB**$2,875,000 <br />210-38-413-5240 FY 2019-20 Budget, General Fund***$1,000,000 <br />141-39-402-5240 FY 2019-20 Budget, Measure B and BB $7,000,000 <br />Total $11,935,000 <br />Asterisks indicate amount listed is less than amount appropriated in the budget, see details <br />below. <br />*$340,000 moved to Pedestrian Crossing 17-18 project via Resolution 2018-113. <br />**$900,000 moved to Street Overlay and Reconstruction 16-17 via Resolution 2018-080 and <br />$3,225,000 moved to Street Overlay and Reconstruction 17-18 via Resolution 2018-081. <br />***$1,260,000 slated for use on Street Overlay and Reconstruction 19-21. <br />Attachments to Staff Report <br />·Bid Results Summary <br />·List of Streets <br />PREPARED BY: Claire O’Brien, Associate/Contract Engineer, Engineering and Transportation <br />Department <br />Page 4 City of San Leandro Printed on 7/1/2020 <br />76
The URL can be used to link to this page
Your browser does not support the video tag.